Chapter 6
Cable Installation
This chapter introduces the procedures of installing the ZXG10 iBSC power cables,
grounding cables, and clock cables.
Table of Contents
6.1 Overview of Cable Installation
Cable installation includes the installation of power cables, grounding cables, internal
cables, and external cables.
6.1.1 Cabling Requirements
Cabling requirements fall into:
l
Power cable and grounding wire requirements;
l
Internal cabling requirements;
l
External cabling requirements.
6.1.1.1 Cabling Requirements of Power Cable and Grounding Cable
1.
Cabling Specification
a.
The power cables and grounding cables shall be separately wired from other
cables. While cabling in the rack, bind them separately instead of binding them
as a whole, which also applies to cabling outside the rack.
b.
Wire the power and grounding cables from the cabinet top, and bind them on the
cabling racks at the top of the equipment room. The spacing between cable ties
should be 200 mm.
6-1
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential