ZXG10 iBSC Hardware Installation Guide
Figure 11-1 Step 1 of Board Plugging
2.
Slowly push the board to the bayonet of board along slide, and enter into square slot
at upper and lower bracket sides of 9U subrack. Refer to
Figure 11-2 Step 2 of Board Plugging
3.
After board connector contacts backplane connector, rotate extractor wrench at two
sides inwards, and move the board to proper place. If you hear a "click" sound at
extractor, it indicates the extractor has been engaged in position. Refer to
11-2
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Содержание ZXG10 iBSC
Страница 8: ...II ...
Страница 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...
Страница 168: ...Figures This page intentionally left blank ...