ZXG10 iBSC Hardware Installation Guide
2.
When connecting the remote warning box in remote networking mode, Router is
necessary.
At the alarm box side, the alarm box connects with HUB via the cable (twisted pair),
Router connects with HUB via the cable (twisted pair), and Route connects with the
transmission network via the transmission cable. At the background server side, the
server connects with HUB via the cable (twisted pair), Router connects with HUB via
the cable (twisted pair), and Route connects with the transmission network via the
transmission cable. This is the remote networking.
shows the remote
networking of the alarm box.
– End of Steps –
8.2 Installing External Sensor
The power distribution subrack is an important component of ZXG10 iBSC alarm system.
It is installed with the Power Distribution Board (PWRD) and the Power Distributor
Backplane (PWRDB). The functions include power indication, environment monitoring,
and internal fan plug-in box monitoring. The external sensor is connected with power
distribution subrack through monitoring cable H-MON-009 that is led out from PWRDB.
H-MON-009 cable is connected with PWRDB and external sensor.
H-MON-009 cable structure is shown in
.
Figure 8-2 Monitoring cable led from PWRDB
End A of H-MON-009 cable is provided with DB25 connector (PWRDB side), connecting
with PWRDB by the external interface SENSORS on the power distribution box backplane.
End B of the cable is provided with five DB9 connectors (sensor side), led out of cabinet
top and used to connect different sensors.
describes the relation between the cable ports and sensors at end B.
8-2
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Содержание ZXG10 iBSC
Страница 8: ...II ...
Страница 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...
Страница 168: ...Figures This page intentionally left blank ...