ZXUPS S60
ZXUPS S606/S610
6/S610 (V1.1) Installation
(V1.1) Installation Manual
Manual
12
12
Confidential and Proprietary Information o
Confidential and Proprietary Information of ZTE CORPORATION
f ZTE CORPORATION
Installing UPS on Floor
Installing UPS on Floor
Drill the floor of the equipment room directly and fix the UPS cabinet
Drill the floor of the equipment room directly and fix the UPS cabinet
with expansion bolts.
with expansion bolts.
Figure 3
Figure 3
shows the
shows the
UPS installation flow on
UPS installation flow on
the floor
the floor
.
.
F
F
I G U R E
I G U R E
3
3
F
F
L O W O F
L O W O F
I
I
N S T A L L I N G
N S T A L L I N G
U
U
P
P
S
S
O
O
N
N
F
F
L O O R
L O O R
Start
Start
Select the
Select the installati
installation
on
position
position
Determine the hole
Determine the hole position
position
for expansion bolts
for expansion bolts
Drill holes and install
Drill holes and install
expansion bolts
expansion bolts
Place UPS in the
Place UPS in the
position
position
Screw down expansion
Screw down expansion
bolts
bolts
Yes
Yes
No
No
Check whether
Check whether
it is qualified
it is qualified
End
End