
8
TribeStar Users Guide
6. Plug the power cord into the back of the TribeStar and then into an electri-
cal outlet. Turn on the power switch located on the back of the TribeStar.
7. Upon start-up, TribeStar undergoes a system self-test. Look for the
correct sequence of LED lighting:
1
st
all LEDs are amber
2
nd
LEDs are alternately green-red-green-red, etc.
3
rd
all LEDs are red
4
th
all LEDs go blank
5
th
LEDs flicker as network traffic occurs
8. Start up all devices connected to TribeStar.
not used
not used
7
not used
6
not used
5
not used
4
3
not used
2
not used
1
not used
not used
not used
not used
not used
not used
not used
not used
not used
not used
TribeStar
StarController
12
not used
11
not used
10
not used
9
not used
8
7
6
5
4
3
2
1
not used
15
not used
14
not used
13
not used
not used
not used
8
not used
7
not used
6
not used
5
not used
4
3
not used
2
not used
1
not used
not used
11
not used
10
not used
9
not used
Management
LocalSwitch
RJ-21 cable pins
16,41
15,40
14,39
13,38
12,37
11,36
10,35
9,34
8,33
7,32
6,31
5,30
4,29
3,28
2,27
1,26
24,49
23,47
22,47
21,46
20,45
19,44
18,43
17,42
25,50
Port Designation
not used
1
not used
Enlargement of top of punch block
1
26
2
27
3
28
12
16
8
Installing TribeStar