6
Installation
Pre-Installation Considerations
Prior to deployment of the Z-PDS, the following site considerations
should be reviewed to ensure the Z-PDS will function properly in its
intended application.
Shipped Items List:
1.
(1) Z-PDS w/ standard attached A-B labeled input 10 ft.
power cords
2.
(2) Rack Mount Brackets
3.
(8) Bracket Mounting Screws
4.
(2) Input Connectors As Ordered (either a. or b.)
a.
(2) Plugs on the A-B 10 foot input SJTW cords.
b.
(2) Hard-Wire Assembly Modules attached to the A-B
10 ft. input SOOW cords.
5.
(1) User Manual
Содержание Z-PDS Series
Страница 1: ...Version 2 3 October 2019 Zonit Power Distribution System Z PDS User Guide ...
Страница 2: ...Version 2 3 October 2019 Table of Contents ...
Страница 13: ...11 Note Examples are implemented via Zonit plug adapters where needed Output Branch Circuit Configurations ...
Страница 20: ...18 Copyright 2019 Zonit Structured Solutions LLC All Rights Reserved ...