Shock and Counterweight Installation
•
Bolt the upper half of the Shock to the Cross
Arm using the 1/2” x 2” hex bolt and hex nut.
•
Do not tighten down on the urethane bushing –
there should be enough play to allow free
movement of Shock eye (approx. 1/16”).
•
Attach the lower half of the Shock using the 1/2”
x 2-1/2” hex bolt and hex nuts.
•
Using two 3/4” wrenches, tighten the nuts to 40-
50 ft-lbs torque.
•
Install the counterweight as shown. At this point,
the position of the Counterweight is not critical.
Somewhere close to the lower 2/3 of the
adjustment range is a good starting point.
End of Method #2 Instructions
Canister Mounting Tabs
•
Canister Mounting Tabs are pre-
assembled with the necessary
hardware.
•
Two of the tabs are mirrored copies of
the other.
•
The strap goes on the top side of the
rack.
•
Loosen the hardware a few turns and
install as shown.
•
Slide the Mounting Tab on to the
extrusion until the corner of the
chamfered edge is even with the end of
the Extruded Rail.
•
Press the Tab firmly against the corner of the Rail and tighten the 3/8” nut to 30 ft-lbs.
•
Repeat procedure for all corners.
Canister Installation
•
Important Note: Fluid is driven between canisters via 1/4” copper tube. When
removing the Canister Set from the package and when straightening the transfer
tube, be careful to not crimp it. We recommend that at least two people handle
the canisters to prevent any damage.