background image

C

HAPTER

  3 O

PERATION

3-10

www.zoll.com

9650-0535-01 Rev. C

Содержание SurePower

Страница 1: ...SurePower Charger Station Operator s Guide 9650 0535 01 Rev C...

Страница 2: ...formation updates are available ZOLL and PowerCharger are registered trademarks and SurePower is a trademark of ZOLL Medical Corporation All other trademarks and registered trademarks are property of...

Страница 3: ...rger and Battery Keys 1 3 Battery Charging Requirements 1 3 Charging Methods 1 4 AutoTest 1 4 QuickCharge 1 4 ManualTest 1 4 Chapter 2 Set Up Powering on the Charger 2 2 Self Test at Power On 2 2 Inst...

Страница 4: ...etting the Most from Your SurePower Battery Pack 5 2 Developing a Battery Management Program 5 2 Chapter 6 Product Specifications SurePower Charger Station SurePower Charger Station 6 1 Appendix A Man...

Страница 5: ...ation s SurePower Charger Station which you use to test recalibrate and charge ZOLL s rechargable defibrillator batteries It is important that you read and understand the information in this manual Th...

Страница 6: ...3 Operation Describes how to use the SurePower Charger Station to test recalibrate and charge ZOLL s rechargable defibrillator batteries Chapter 4 Maintenance and Troubleshooting Describes how to cle...

Страница 7: ...efer to Operator s Guide for more information DANGER high voltage present Protective earth ground terminal Alternating current Temperature Limitation Conformit Europ enne Complies with medical device...

Страница 8: ...nection to a personal computer for use with optional software With respect to electric shock fire mechanical and other specified hazards only in accordance with UL 60601 1 and CAN CSA C22 2 No 601 1 M...

Страница 9: ...escribe conditions or actions that can result in personal injury or death Caution Caution statements describe conditions or actions that can result in damage to the SurePower Charger Station Note Note...

Страница 10: ...also notify the carrier Contacting Technical Service The SurePower Charger Station does not require periodic recalibration or adjustment You should however periodically perform the tests that this man...

Страница 11: ...wo characters of the date of manufacture code give the last two digits of the year for example 05 would appear for products manufactured in 2005 The last character of the date of manufacture code give...

Страница 12: ...uring operation Do not use the SurePower Charger Station unit stacked with other equipment Do not use a battery unless the charger s Ready LED is lit and the Fault LED is off Failure to do so may resu...

Страница 13: ...hazard Do not install batteries into Monitor Defibrillators or a SurePower Charger Station that is not plugged into live AC mains when storage may exceed 90 days Battery damage may occur Notes If you...

Страница 14: ...different from originator s organization company name address contact name and contact phone number 4 Date when the change took effect Please address the information to ZOLL Medical Corporation Attn...

Страница 15: ...once It is a multi chemistry charger that works with both ZOLL lithium ion and lead acid batteries Figure 1 1 SurePower Charger Station SurePower Charger Station Charging Bays The charging bays in th...

Страница 16: ...his icon to indicate that the battery is fully charged and ready for use Test button Pressing this button initiates a manual test of the battery or if the bay is empty a test of the charging bay Test...

Страница 17: ...rrect keys will not seat in the charging bays and cannot be charged and tested by the SurePower Charger Station For example the AED PRO defibrillator s disposable battery pack is keyed differently and...

Страница 18: ...od is the default charging method for ZOLL s lead acid batteries because it helps lead acid batteries maintain their storage capacity and extend their usable life QuickCharge The QuickCharge charging...

Страница 19: ...ll and remove batteries Make sure that there are at least four inches of clear space surrounding the charger This provides the air circulation necessary for the charger to dissipate the heat that it g...

Страница 20: ...and AC power is available Warning Always inspect the AC cord before use Do not use the AC cord if it is defective for example the cord s insulation is cracked or the cord is severely kinked Self Test...

Страница 21: ...se these well spacers if you will be charging only SurePower Battery Packs The well spacers improve the fit of SurePower Battery Packs in the charger bays and prevent older ZOLL lead acid batteries fr...

Страница 22: ...CHAPTER 2 SET UP 2 4 www zoll com 9650 0535 01 Rev C...

Страница 23: ...tery pack follow this procedure Step Action 1 Insert the battery into an open battery bay Place the back of the battery against the back of the charging bay and then press the battery down until it cl...

Страница 24: ...3 Allow the battery time to charge The charging time will depend on the battery type how depleted the battery was when you put it into the charger and which charging method the battery requires When t...

Страница 25: ...into the recess at the semi circular opening of the charging bay press the battery s locking clip to disengage it from the latch and then lift the battery out Note If the charged battery has failed th...

Страница 26: ...ck s Test button If the battery s Fault LED lights remove the battery pack from service If the battery pack s fault light does not light test the battery pack in another charger Testing Batteries Manu...

Страница 27: ...e charging bay and press the Test Button on the bay s control panel The charger lights the Test LED and begins testing the battery The Test LED will remain lit for the duration of the test When the ba...

Страница 28: ...harger that is not fully functional and as such not capable of maintaining a sufficient number of fully charged batteries to operate all of your ZOLL defibrillators effectively To test a battery bay f...

Страница 29: ...the LED display and beeps indicate during different operating modes The charger lights LEDs in one of two ways steady persistent or brief periodic Indicators When Powering On or Testing the Unit Char...

Страница 30: ...ry charging ON steady Battery in bay AutoTest or Manual Test Method battery being drained ON steady Battery Test in progress AutoTest or Manual Test Method battery charging ON steady ON steady Battery...

Страница 31: ...emoving a Battery Charger Operational State Charge LED Ready LED Test LED Fault LED Audible Alarm Battery removed from bay no battery fault detected Battery removed from bay battery fault detected 2 B...

Страница 32: ...CHAPTER 3 OPERATION 3 10 www zoll com 9650 0535 01 Rev C...

Страница 33: ...e to the charger housing 2 Inspect the AC cord for severe kinks or exposed wires 3 Connect the charger to live AC mains The charger will beep turn on the fan and light all LEDs for several seconds The...

Страница 34: ...ck for a defective power cord Plug the charger into another power source 2 Charging LED does not light when a battery is in the battery bay Check to see if the charger is in the drain phase of a batte...

Страница 35: ...batteries used and the pattern of discharging and recharging batteries Because of this it is good practice to replace and discard used batteries on a preventive scheduled basis The most effective prev...

Страница 36: ...ufficient number of batteries and chargers Have a sufficient number of batteries and battery chargers to insure that every ZOLL resuscitation device has fully charged main and spare batteries ready at...

Страница 37: ...should be more frequent since failure may occur rapidly at the battery s end of life At a minimum ZOLL recommends testing every three months 7 Develop a battery recycling and disposal plan The disposa...

Страница 38: ...CHAPTER 5 USING ZOLL RECHARGABLE BATTERIES EFFECTIVELY 5 4 www zoll com 9650 0535 01 Rev C...

Страница 39: ...100 240 Vrms 50 60 Hz 120 Vrms 400 Hz Power Consumption 200 VA maximum Output per Bay Voltage 6 to 16 8 V dc Charging Current 0 to 3 00 A dc Discharging Current 0 to 3 00 A dc Maximum Thermal Output...

Страница 40: ...NS SurePower Charger Station 6 2 www zoll com 9650 0535 01 Rev C Altitude of Operation 300 ft through 20 000 ft below and above sea level 91 m through 6096 m below and above sea level 1060 through 500...

Страница 41: ...uses RF energy for internal function Therefore its RF emissions are very low and are not likely to cause any interference in nearby electronic equipment RF emissions CISPR 11 Class A The SurePower Cha...

Страница 42: ...er quality should be that of a typical commercial or hospital environment Voltage dips short interruptions and voltage variations on power supply input lines IEC 61000 4 11 5 UT 95 dip in UT for 0 5 c...

Страница 43: ...s m Field strengths from fixed RF transmitters as determined by an electromagnetic site survey a should be less than the compliance level in each frequency range b Interference may occur in the vicini...

Страница 44: ...tions equipment Rated Maximum Output Power of Transmitter W Separation Distance According to Frequency of Transmitter m 150 kHz to 80 MHz d 1 2 80 MHz to 800 MHz d 0 35 800 MHz to 2 5 GHz d 0 7 0 01 0...

Отзывы: