13
3
5
5
4
3
6
7
9
8
Belt tension adjustment
Place pulley cover A so that it is in bet-
ween the eight pulley cover seats ,and t-
hen secure it to the pulley cover base with
the four screws .
3
Push the belt downward,and then install
pulley cover B to pulley cover A with
the three screws .
6
If the machine is being used with the puller
attached,install the puller belt cover with
the two screws .
8
8
Place the V-belt onto the motor pulley .
Turn the two nuts to adjust so that there
is 20
~
30mm of deflection in the V-belt
when it is pressed at the midway point wi-
th a force of 9.8 N (1kgf).
4
3
5
4
2
2
6
3
7
9
9
8
1
2
3
4
3
2
1
3
2
4
4
3
Содержание ZJ927 Series
Страница 1: ...ZJ927 928 HIGH SPEED FEED OFF THE ARM CHAINSTITCH MACHINE SERIES INSTRUCTION MANUAL AND PARTS LIST...
Страница 2: ......
Страница 12: ...Work table and motor Work table Common Work table Servo Direct Drive Work table 2 1 3 4 5 1 3 5 6 7...
Страница 37: ......
Страница 41: ...Upper shaft mechanism 3 4 6 7 8 9 8 10 11 12 16 17 18 19 20 21 15 16 14 5 1 927 PULLY 928 PULLY 2 13 3 22...
Страница 49: ...Lower shaft mechanism 1 2 3 4 5 6 7 8 9 10 11 11...
Страница 69: ...31...
Страница 71: ...33...
Страница 73: ...Gear box haul material wheel 1 3 4 9 8 7 6 5 10 11 12 6 13 14 16 17 19 18 16 2 20 21 22 15 4 23 35...
Страница 89: ...Gas control device 51 17 11 12 8 4 10 6 4 4 9 7 14 3 26 13 16 22 19 20 23 18 21 25 24 3 4 4 5 3 3 1 2 15...
Страница 95: ...Servo direct drive device 1 20 20 23 24 57 3 22 2 27 7 5 26 6 15 8 18 10 16 11 21 17 12 13 14 19 25 4 9...