STEP 4

 

PIPING

 

1)  Adding bathroom fixtures - The Qwik Jon

®

 Ultima is designed to accept 

bathroom fixtures utilizing the two side inlets. These inlets can be attached via 

the 2" MPT (outside diameter) or the 1½" slip (inside diameter). These inlets 

must have the inner portion drilled out using a 44 mm (1¾") hole saw(see 

Figure 3.2). This is to ensure there are no leakage problems from inlets not in 

use. When utilizing side inlets, install a check valve on the incoming line.
  2)   Cut and dry-fit the pipe and fittings as required for 1" diameter discharge 

pipe (may be reduced to ¾" diameter if codes permit).
  3)  While dry-fitting the discharge pipe, position and mark the location of 

the pump unit discharge fitting.

  4)  Cut and dry-fit 1½" vent pipe as required to ensure that the vent 

pipe does not interfere with other components. Make the connection to the 

pump unit with the provided street elbow.  A 2" x 1" 90° discharge fitting has 

been provided,  however, it may be easier to pipe straight up depending on 

the installation.  

 Proper venting is required.  Do not use a 

mechanical type vent.

  5)  Clean, prime and solvent weld the inlet and discharge piping and 

pump unit discharge fitting.  

 When applying solvent weld to 

discharge fitting, ensure that none gets into the check valve assembly (see 

Figure 3.3). Pay close attention to the proper alignment of the discharge fitting 

previously marked above.
  6)  Clean and solvent weld vent piping as required for proper venting.

SK2673

SK2591

DRILL POINT

1-1/2" SLIP INSIDE

2" MPT OUTSIDE

SK2586

figure 3.1

figure 3.2

figure 3.3

Discharge

Vent

Do not put glue in this area.

  1)  Install the closet bolts at the points marked earlier.
  2)  Place the toilet assembly over the closet bolts. Install the anchoring 

hardware and tighten in an alternating pattern. Check for level and shim 

as required. Be careful when tightening bolts or nuts against china to 

avoid cracking the china.

  3)  Install rubber bellows onto the toilet discharge and grinder tank hub 

and secure with the worm clamps provided for installation. See sketch 

in Step 3. For built-in installation, install the rubber couplings to both 

the grinder tank and the toilet discharge and secure to extension pipe 

with worm clamps provided. See sketch in Step 4.

  4)  Install the water supply line from the existing water shut-off valve to the 

toilet water supply connection.

  5)  Open the water supply valve and check for leaks. The toilet tank should 

fill to the proper level. Adjust if required.

  6)  Plug the pump's power cord into the outlet.
  7)  Flush the toilet and watch for proper operation. Listen for the pump to 

start. The pump unit requires proper venting in order for toilet to flush. 

Check for leaks.

  8)  Repeat flush cycles to assure proper operation.

FLOOR LEVEL TO WITHIN 1/8"

PUMP UNIT

AUX. INLET

WATER

SUPPLY

GFCI

OUTLET

DISCHARGE

PIPE

VENT PIPE

(PER ALL CODES.

DO NOT USE

MECHANICAL VENT.)

SK2595

  STEP 5 

TOILET INSTALLATION (TOILET SUPPLIED BY OTHERS)

NOTE:

 May not be pictured exactly as shown.

Содержание QWIK JON ULTIMA 203

Страница 1: ...ANDLING DO NOT UNDER ANY CIRCUMSTANCES REMOVE THE GROUND PIN The 3 prong plug must be inserted into a mating 3 prong grounded receptacle If the installation doesnothavesuchareceptacle itmustbechangedtothepropertype wired and grounded in accordance with the local electrical code and all applicable local codes and ordinances 7 Risk of electrical shock Do not remove power supply cord and strain relie...

Страница 2: ...r from date of purchase by the end user or 18 months from date of original manufacture of the product whichever comes first Parts that fail within the warranty period one year from date of purchase by the end user or 18 months from the date of original manufacture of the product whichever comes first that inspections determine to be defective in material or workmanship will be repaired replaced or...

Страница 3: ...twostops C WATER LEVEL EXCESSIVE BEFORE PUMP TURNS ON Float ON point adjusted too high Lower the upper float stop D PUMP WILL NOT SHUT OFF OR RUNS TOO LONG BEFORE WATER IS PUMPED Pump not plugged into piggyback float switch receptacle Ensure pump is not plugged directly into the outlet Plug pump into piggyback float switch receptacle Debris under float Remove debris from around float Faulty float ...

Страница 4: ...arp objects do not puncture the pump unit Level the pump unit within 1 8 using hydraulic cement or similar material STEP 3 ROUGH IN 1 Position the pump unit a minimum of 1 8 from the wall with the inlet facing forward Attach the bellows to the inlet using the worm drive clamp provided 2 Place the toilet in front of pump unit aligning the discharge of the toilet with the inlet of the pump unit Make...

Страница 5: ...sly marked above 6 Clean and solvent weld vent piping as required for proper venting SK2673 SK2591 DRILL POINT 1 1 2 SLIP INSIDE 2 MPT OUTSIDE SK2586 Figure 3 1 Figure 3 2 Figure 3 3 Discharge Vent Do not put glue in this area 1 Install the closet bolts at the points marked earlier 2 Place the toilet assembly over the closet bolts Install the anchoring hardwareandtighteninanalternatingpattern Chec...

Страница 6: ...40 5 10 0 2 5 25 100 80 60 20 50 TOTAL DYNAMIC HEAD FLOW PER MINUTE SEWAGE PUMP PERFORMANCE CURVE MODEL 202 FEET METERS 4 10 15 6 20 Shut off Head 15 4 6 Feet Meters 5 10 1 5 3 0 MODEL 30 ft 9 1m 35 132 Gal Liters 45 40 170 151 202 45 40 35 30 25 30 35 120 140 160 180 8 10 20 6 1 27 102 25 7 6 16 61 018512 ...

Страница 7: ... rights reserved MAIL TO P O BOX 16347 Louisville KY 40256 0347 SHIP TO 3649 Cane Run Road Louisville KY 40211 1961 502 778 2731 1 800 928 PUMP FAX 502 774 3624 Your Peace of Mind is OurTop Priority visit our web site www zoeller com ...

Страница 8: ... Copyright 2012 Zoeller Co All rights reserved ...

Отзывы: