4
© Copyright 2014 Zoeller Co. All rights reserved.
SK2959
For Installation,
Maintenance,
Troubleshooting
and Service
Checklist,
please
refer to
the corresponding Pump Installation Manual and Replacement Parts List.
SK301
1
1 1/2 SCH 40 PVC PIPE X 8 1/4"LG. (ALL
MODELS)
1 1/2 SCH 40 PVC PIPE X 2 1/8"LG
1 1/2 SCH 40 PVC
TEE
CHECK
VAL
VE ASM
W
-RUBBER COUPLING
AND CLAMPS NOTE: CHECK V
AL
VE SCREWS
INT
O PRIMAR
Y PUMP
DISCHARGE.
HAND-TIGHTEN ONL
Y.
WEEP
HOLE MUST
BE
VISIBLE.
FLOA
T SWITCH
DC PUMP
M53 OR M98 PRIMAR
Y PUMP
TYPICAL
INST
ALLA
TION
EXPLODED VIEW OF PUMP
SYSTEM
OUTLET
PUMP
PRIMAR
Y
1" MIN.
IMPOR
TANT
: OFF LEVEL
OF
FLOA
T ASSEMBL
Y
MUST
BE HIGHER
THAN
DC BACKUP
PUMP
DC PUMP
INST
ALLED IN LINE WITH SUBMERSIBLE PUMP
BA
TTER
Y BOX
DC CHARGER
OUTLET
CHARGER
R
R
FIGURE 1
FIGURE 2
Note:
This drawing is dimensioned for clarity
.