Zoeller BA840 Скачать руководство пользователя страница 11

11

© Copyright 2020 Zoeller

®

 Co. All rights reserved.

Cutter Maintenance

To remove star cutter:  Remove guard ring then heat the 

center bolt to 350 °F to loosen Loctite® thread sealant.

Grind the Star Cutter and Disc seen here to a 32 microfinish.  

Surfaces must be flat to within 0.001" T.I.R.  Gap must be between 

0.004" and 0.008" on these parts.

1. 

All power circuits must be disconnected and locked out before any attempts 
are made at servicing.

  

The star cutter and disc can be removed and 

sharpened by grinding the cutting faces.  Both star cutter and disc 
must be removed from the pump.  Removal of these parts can be 

accomplished in the field by removing pump from the sump and 

positioning horizontally to access the intake of the pump.  If seals 
or other repairs are required, the pump must be totally removed 

and serviced in a shop by a qualified pump technician or authorized 

service center.

2.  Remove the three countersunk screws on the plastic guard ring 

and remove the ring.

3.  Thoroughly clean the star cutter and disc assembly.  Tilt pump 

back to the vertical position to make certain the end play has 
been removed.  Check and record the clearance between the star 
cutter and disc with a feeler gage.  The correct running clearance 
is between 0.004" and 0.008".

4.  With pump in horizontal position, heat the hex head bolt in the center 

of the star cutter with a propane torch.  The bolt must be heated to 

350 °F to soften the thread lock sealer on the bolt for ease of removal.  

Remove the bolt by turning in a counterclockwise rotation.  It will 
be necessary to use a wood block to prevent the star cutter from 
turning while removing the bolt.  Pull star cutter from the shaft and 
remove the spacer shims located behind the star cutter.

5.  Remove the three cap screws holding the disc and remove disc 

from the pump.

6.  The disc and star cutter can be replaced with new service parts or 

resurfaced by grinding.  Resurfacing is accomplished by surface 

grinding both disc and star cutter to a 32 micro finish.  Do not attempt 
grinding in the field.  Send parts to a qualified machine shop or 

return to the factory for repair. The disc, star cutter and shims are 
a matched set.  Keep parts together.  Measure disc before and after 
resurfacing with micrometer and record measurements.

7.  After resurfacing, the disc and star cutter must be flat within 0.001".  

If the disc has been surface ground, it will be necessary to remove 
shims to compensate for the material removed from the disc.  As a 
starting point, remove shims of the same thickness as the amount  
machined from the cutter disc (step 6 above).  Final running clearance 
must be between 0.004" and 0.008".  Be sure pump is in vertical 
position and all end play has been removed before measuring.

8.  Clean bottom of pump where disc is located and replace disc and 

retainer screws.  Torque to 63-67 in-lbs.  Replace star cutter with 

the correct shims.  Install washer and torque hex head bolt to 71-75 

in-lbs. apply Loctite 262 thread-lock sealant or equal to bolt threads 
prior to insertion.  Check running clearance with pump in vertical 
position to remove end play.  Clearance must be between 0.004" and 

0.008" to obtain efficient grinding when pump is put back in service.

9.  Replace plastic guard ring and its three screws.

10.  Check the oil in the motor housing before reinstalling.  Contact the 

factory if the oil has a milky appearance or burnt smell.  The level 

should be even with the fill plug when pump is in the upright position.  

Add oil if required. Use insulating oil supplied by the factory.

FIGURE 7.

(Model 840 components shown)

Содержание BA840

Страница 1: ...ause serious personal injury death or major property damage Warns of hazards that CAN cause personal injury or property damage INDICATES SPECIAL INSTRUCTIONS WHICH ARE VERY IMPORTANT AND MUST BE FOLLOWED THOROUGHLY REVIEW ALL INSTRUCTIONS AND WARNINGS PRIOR TO PERFORMING ANY WORK ON THIS PUMP MAINTAIN ALL SAFETY DECALS PUMPSWITHTHE US MARKARETESTEDTOULSTANDARDUL778 CSA CERTIFIED PUMPS ARE CERTIFIE...

Страница 2: ...tinuous service during unusual conditions Recommended Limits of Application 800 Series Grinder Pumps These recommended application limits are for pump stations pumping to a gravity main Low pressure pipe systems should be designed with a pump located at each house For applications where a lift station would handle between 15 and 60 homes consider the 71 Series grinder pump which is available throu...

Страница 3: ... other pit peculiarities and are secured so that the grinder pump will shut off It is recommended to use rigid pipe and fittings and the pit be 24 in diameter for simplex systems and 36 in diameter for duplex systems or larger 4 Grinderinstallationsshouldbecheckedyearlyfordebrisand orbuild up which may interfere with the ON or OFF positions of variable level float control switches Repair and servi...

Страница 4: ...tem installation 3 All electrical connections including pump to control box and power supply to control panels must comply with the National Electrical Code and applicable local codes Conduit and panel enclosure openings must have a gas and watertight seal Installation of electrical panels conduit and connections should be made by a qualified licensed electrician A UL Listed potting kit P N 10 235...

Страница 5: ...RELAY START CAPACITOR GREEN RED WHITE BLACK BLUE ORANGE MOISTURE SENSOR TERMINALS WHITE BLACK 14 6 18 2 REVERSE MOTOR ROTATION BY INTERCHANGING ORANGE WIRE WITH RED WIRE L2 RUN CAPACITOR GROUND SCREW 2 1 5 COMPONENT LAYOUT PUMP START RELAY START CAPACITOR RUN CAPACITOR RED WHITE ORANGE BLACK MAIN START PROTECTOR BLACK WHITE L1 L2 T2 T1 230V AC OR 208V AC CONTACTOR BLUE 2 1 5 SINGLE PHASE MODELS 84...

Страница 6: ...d Indoor Prepackaged System FIGURE 5 All installations must comply with all applicable electrical and plumbing codes including but not limited to the National Electrical Code local regional and or state plumbing codes etc SK1695 36 48 60 24 NOMINAL ...

Страница 7: ...rly 5 Dig a hole for the basin The basin should be located in a very low traffic area within 15 of the power disconnect The hole should be at least8 largerindiameterthanthebasininordertoleave4 ofbackfill all the way around the perimeter A minimum of 4 of compacted subbase is also required Backfill and subbase should be 1 8 to 3 4 pea gravel or 1 8 to 1 2 crushed stone Also reference the basin inst...

Страница 8: ...GLASS AFD 1 25 2 Z RAIL 2 CAST IRON CHECK VALVE 3 4 GUIDE RAILS 2 SCH 80 BALL VALVE 2 FLEX BOOT FITTING LOCATION VARIES WITH BASIN DEPTH FLOAT TREE ASSEMBLY 2HP GRINDER PUMP 2 PVC SCH 80 PLBG 1 8 302 STAINLESS STEEL LIFTING CABLE ALARM ON OFF SOLID FIBERGLASS COVER HIGH WATER ALARM OR SIMPLEX CONTROL PANEL FIELD INSTALLED ALARM FLOAT SWITCH MUST OPERATE OFF LOW VOLTAGE TO BE USED WITH QWIK BOX SK3...

Страница 9: ...n the basin s side wall in a 5 hole drilled with a hole saw at a location lining up with the inlet pipe 6 The bottom of the excavation can now be properly backfilled compacted and leveled Set basin in hole Ensure the removable cover extends above the finished grade line and the grade slopes away from the unit Backfill and subbase should be 1 8 3 4 pea gravel or 1 8 1 2 crushed stone Reference basi...

Страница 10: ... installed Floats positioned properly Discharge valves open 3 16 vent hole drilled in pipe between check valve and pump Once the above has been verified proceed with the following checks Pump power cables and control floats properly installed and voltage verified Conduit connections to panel and junction box are properly sealed After installing the pump into the containment area with adequate subm...

Страница 11: ...nd remove the spacer shims located behind the star cutter 5 Remove the three cap screws holding the disc and remove disc from the pump 6 The disc and star cutter can be replaced with new service parts or resurfaced by grinding Resurfacing is accomplished by surface grindingbothdiscandstarcuttertoa32microfinish Donotattempt grinding in the field Send parts to a qualified machine shop or return to t...

Страница 12: ...Service Checklist Electricalprecautions Beforeservicingagrinderpump alwaysshutoffthemainpowercircuit Makesureyouarewearing insulated protective sole shoes and not standing in water Under flooded conditions contact your local electric company or a qualified licensed electrician for disconnecting electrical service to the pump prior to removal Grinder pumps contain oil which becomes pressurized and ...

Отзывы: