Recommended Limits of Application for Progressing Cavity Grinder Pumps

Simplex Station

Duplex Station

Model

HP

Homes

GPD/LPD

Homes

GPD/LPD

810

1

1

400 / 1,514

2

800 / 3,028

815

2

1

400 / 1,514

2

800 / 3,028

These recommended application limits are for pump stations pumping to a gravity main. Low-pressure collection systems should be designed with 

a pump located at each house. For applications where a lift station would handle more than 2 homes, consider the 840 or 71 Series grinder pump.  

For applications where a lift station would handle more than 60 homes, a solids handling type pump should be considered.

FIG. 1.1

153091

1.  Zoeller Progressing Cavity Grinder Pumps are designed for grinding 

and pumping sanitary sewage from submersible lift stations.  The 

pump is intended to grind and pump reasonable quantities of items 

normally found in sanitary sewage applications.

2.  Zoeller 810 and 815 Progressing Cavity Grinder Pumps can be 

installed in new applications or as a direct replacement for any grinder 

application of like size and capacity. Some rail system retrofit kits are 

available.

3.  The 810 and 815 can be installed in a Prepackaged Job Ready System 

or may be used in a Field-Assembled basin package. Page 5 shows 

a couple of the Prepackaged Systems. Field Assembled Systems are 

discussed on page 4.

4.  Zoeller  810  and  815  Grinder  Pumps  can  be  retrofitted  to  existing 

positive displacement pump installations.

Applications

FIG. 1.2

CONSULT FACTORY

FOR INTERMITTENT

USE ABOVE 73 

METERS TOTAL 

DYNAMIC HEAD,

MAXIMUM PUMP 

OUTPUT 80 METERS

0.5

10

PUMP PERFORMANCE

CURVE

MODEL 815 50 Hz

1.0

1.5

2.0

2.5

3.0

20

30

40

50

60

70

80

0

L/sec

m /hr

3

METERS

FEET

0

40

80

120

160

200

240

FLOW RATE

TO

TAL D

YNAMIC HEAD

0.4

0.2

0.6

0.8

90

280

MODEL

815

Feet

5

Meters

m /hr

L/sec

3

10

20
40
60
80

100
120
140
160
180

200
220

1.5

3.0

6.1

12.2
18.3
24.4

30.5
36.6
42.7
48.8
54.9
61.0

67.1

73.2

240

2.45
2.43
2.36
2.27
2.18
2.07

1.98
1.86
1.77
1.66
1.57
1.45
1.36

0.68
0.68
0.66
0.63

0.61

0.58
0.55
0.52
0.49
0.46
0.44
0.40
0.38
0.35

1.27

60 Hz

50 Hz

0

2

4

6

8

10

12

14

16

0

20

40

60

80

100

120

140

160

180

200

260

PUMP PERFORMANCE CURVE

MODEL 810/815

8

16

24

32

40

48

56

64

GALLONS
LITERS

METERS

FEET

TOT

AL

 DYNAMIC HEAD

FLOW PER MINUTE

220

240

72

20

40

60

10

20

30

40

50

60

70

80

90

100

110

0

PSIG

TOT

AL

 DYNAMIC HEAD

2 HP

1 HP

LOW PRESSURE SEWER

TYPICAL

OPERATING

RANGE

DESIGN PRESSURE (150 FT OR LESS)

TOTAL DYNAMIC HEAD/FLOW

PER MINUTE

MODEL

Feet

810

Meters

Gal.

Liters

MODEL

815

5

10

20

6.1

3.0

1.5

14.6

55

40
60

18.3

12.2

80

100

30.5

24.4

120

36.6

140
150

45.7

42.7

55
53
50
47
44

41

38
36
34

14.4
14.0
13.2
12.5
11.7
10.9

10.1

9.4
9.0

160

48.8

180

54.9

200

61.0

220

67.1

240

73.2

5.5

33
30
27
24

21

8.6
7.8
7.0
6.3

018330

Содержание 810

Страница 1: ... serious personal injury death or major property damage Warns of hazards that CAN cause serious personal injury death or major property damage Warns of hazards that CAN cause personal injury or property damage INDICATESSPECIALINSTRUCTIONSWHICHARE VERY IMPORTANT AND MUST BE FOLLOWED THOROUGHLY REVIEW ALL INSTRUCTIONS AND WARNINGS PRIOR TO PERFORMING ANY WORK ON THIS PUMP MAINTAIN ALL SAFETY DECALS ...

Страница 2: ...ld be taken that the tethered float switch will not hang up on the pump apparatus or pit peculiarities and is secured so that the pump will shut off It is recommended to use rigid piping and fittings and the pit be 45 cm 18 or larger in diameter 3 Pump should be checked frequently for debris and or build up which may interfere with the float on or off position Repair and service should be performe...

Страница 3: ...Prepackaged Systems Field Assembled Systems are discussed on page 4 4 Zoeller 810 and 815 Grinder Pumps can be retrofitted to existing positive displacement pump installations Applications FIG 1 2 CONSULT FACTORY FOR INTERMITTENT USE ABOVE 73 METERSTOTAL DYNAMIC HEAD MAXIMUM PUMP OUTPUT 80 METERS 0 5 10 PUMP PERFORMANCE CURVE MODEL 815 50 Hz 1 0 1 5 2 0 2 5 3 0 20 30 40 50 60 70 80 0 L sec m hr 3 ...

Страница 4: ...emoving the cover Start and run winding resistance can only be measured after removing the cover and checking at the through wall terminals General Information PROGRESSING CAVITY GRINDER PUMP DESCRIPTION 1 Pumps are constructed of class 30 cast iron protected with powder coated epoxy for long life when pumping sewage in submersible applications The cutter assembly is comprised of stainless steel c...

Страница 5: ...MP CONTROL FLOAT FLOAT TREE SK2540 PIPE SEAL FIELD INSTALLED 60 9 cm 24 MIN DN100 4 RUBBER INLET HIGH WATER ALARM NOT INCLUDED 213 cm 84 183 cm 72 152 cm 60 SOLID FIBERGLASS COVER FIBERGLASS ANTI FLOTATION FLANGE DISCHARGE FITTING 1 1 4 BULK HEAD CHECK VALVE 1 1 4 FEMALE NPT DISCHARGE PIPE 1 1 4 GALVANIZED WATERTIGHT QWIK BOX DN50 2 PVC ELECTRICAL PIPE DN32 1 1 4 PVC SLIP X SLIP FIBERGLASS BASIN B...

Страница 6: ...acket slides into the disconnect fitting 11 Pouring a concrete anchor around system can now be completed Basin should be filled with water when pouring concrete to minimize movement of the system Backfillaroundbasinwithspecifiedmedia Careshouldbeusedtoavoiddamaging componentsorleavingvoidswhenbackfilling RefertoBasininstallationreference guide on more specific requirements 12 Note The progressing ...

Страница 7: ...30 kg 67 in lbs Replace star cutter with the correct shims Install washer and torque hex head bolt to 23 kg 71 in lbs 34 kg 75 in lbs apply Loctite 262 thread lock sealant or equal to bolt threads prior to insertion Check running clearance withpumpinverticalpositiontoremoveendplay Clearance must be between 0 178 mm 0 007 and 0 305 mm 0 012 to obtain efficient grinding when pump is put back in serv...

Страница 8: ...uld be performed by a Zoeller Pump Company Authorized Service Station only SAFETY PROCEDURES For your protection always disconnect pump and panel from its power source before handling Never enter the basin until it has been properly vented and tested Any person entering a basin should be wearing aharnesswithsafetyropeextendingtothesurfacesothattheycan be pulled out in case of asphyxiation Sewage w...

Отзывы: