On some installations, it may be desirable 

to install an independent hanger for the 

level control switches to avoid possible 

hang-ups on the pumps, piping, valves, 

etc.    Float  hangers  are  available  from 

Zoeller Company on Catalog Sheet FM0526 

or can be fabricated from standard pipe 

and fittings.

Suggested Methods of Float Installation

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

TYPICAL FLOAT HANGER ON STEEL COVER PITS

ACCESS COVER

STANDARD PIPE

FLANGE

PVC OR LIGHT WEIGHT

STAINLESS STEEL PIPE

PEA GRAVEL

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

10-1457 FLOAT TREE

WITH 3 FLOATS SHOWN

SK1217

SK1218

RECOMMENDED INSTALLATION FOR ALL APPLICATIONS

All installations must comply with all applicable electrical and plumbing codes, including,  but not limited to, National Electrical Code, local, regional, and/or state 

plumbing codes, etc. Not intended for use in hazardous locations.

TYPICAL SEWAGE INSTALLATION

SK290

4” (100 mm)
OF GRAVEL

Always refer to 

FM0551 and/or 

SSPMA recom-

mended sewage 

pump installation 

and maintenance.

TYPICAL EFFLUENT INSTALLATION

SK291

WW1 
EFFLUENT
FILTER

See FM0531, FM0732, FM1597 & FM1420 

for alarms, controls & junction boxes

TYPICAL DEWATERING INSTALLATION

SK292

TURN

ON

TURN

OFF

1

2

3

7

9

14

8

6

4

5

10

12

13

4” (10 cm) OF GRAVEL

    MINIMUM

(457 mm X 610 mm)

 18"x24" BASIN

 LARGER DEPTHS
    MAY BE 
   REQUIRED.

See FM0531, FM0732, FM1597 & FM1420 

for alarms, controls & junction boxes

 

1.   Electrical wiring and protection must be in accordance with governing 

electrical codes.

  2.    Install  proper  Zoeller  Unicheck  (combination  union  and  check  valve), 

preferably  just  above  the  basin  to  allow  easy  removal  of  the  pump 

for  cleaning  or  repair.    If  high  head  or  below-cover  installation  is 

required, use 30-0164 on 1-1/2" (DN40) pipe, 30-0152 on 2" (DN50) pipe 

and 30-0160 on 3" (DN80) pipe.   

  3.  All installations require a basin cover to prevent debris from falling into 

the basin and to prevent injury.

   4.   When  a  Unicheck  is  installed,  drill  a  3/16"  (5  mm)  diameter  hole  in  the 

discharge pipe even with the top of the pump. 

NOTE: THE HOLE MUST 

ALSO BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY. 

(High  Head  unit  see  “Caution”  on  front  page).  Water  stream  will  be 

visible from this hole when pump is operating.

  5.   Securely tape or clamp power cord to discharge pipe, clear of the float 

mechanism(s). 

  6.  Use a discharge pipe equivalent in diameter to the pump's discharge. 

  7.   Basin must be in accordance with governing codes and specifications.

  8.   Pump  must  be  level  and  float  mechanism(s)  clear  of  sides  of  basin 

before starting pump.     

  9.  Basin must be clean and free of debris after installation.
  10.   Gate valve, shut-off valve, or ball valve to be supplied by installer and 

installed according to any and all codes.

  11.   Locate float switches as shown in sketches. The best place for the “off” 

point  is  above  the  motor  housing  and  positioned  180°  from  the  inlet. 

Never put “off” point below discharge on pump 

  12.  Gas-tight seals are required to contain gases and odors.
  13.     Vent gases and odors to the atmosphere through vent pipe. Must comply 

with local codes but not required for dewatering.

    14.     Optional pump stand (P/N 10-2421) eliminates the need for blocks or 

bricks under the pump.  For use with effluent and dewatering pumps only.

  

15.     Optional watertight control box available, see FM1597 for details.

   16.    For proper spacing of "On" - "Off" switches refer to local or        

  national standards and guidelines.

  17.    Optional septic tank risers for easy access to pump, controls and filters.

Содержание 55/59 Series

Страница 1: ...its and hardware should only be performed by a qualified licensed electrician 7 Risk of electrical shock Do not remove power supply cord and strain relief or connect conduit directly to the pump If th...

Страница 2: ...or seal bound mechanically motor shorted C Pump starts and stops too often Float switch tether length too short check valve stuck open or none installed in long distance line overload open bidding su...

Страница 3: ...asin to allow easy removal of the pump for cleaning or repair If high head or below cover installation is required use 30 0164 on 1 1 2 DN40 pipe 30 0152 on 2 DN50 pipe and 30 0160 on 3 DN80 pipe 3 Al...

Страница 4: ...motor starting devices with motor overload protection See FM0486 for duplex installations Pumps must be installed in accordance with the National Electrical Code and all applicable local codes and ord...

Страница 5: ...e la tapa del foso a fin de purgar la unidad del aire atrapado Deber revisarse peri dicamente el agujero de ventilaci n para verificar que no est atascado Un agujero de ventilaci n en una aplicaci n d...

Страница 6: ...te y con puesta a tierra adecuado NO corte empalme o da e el cable de alimentaci n el ctrica Empalme nicamente cuando hay una caja de conexi n herm tica NO transporte o levante la bomba por su cable d...

Страница 7: ...ar el punto off d bajo de la entrada de la bomba 12 Los sellos herm ticos contra gases son necesarios a fin de contener los gases y olores 13 Ventile los gases y olores a la atm sfera a trav s del tub...

Страница 8: ...i n el ctrica ni el dispositivo de alivio de tensi n y no conecte un conductor directamente a la bomba ADVERTENCIA La instalaci n y verificaci n de los circuitos el ctricos y del equipo deber n llevar...

Страница 9: ...n la base pour r duire le colmatage et la d faillance des joints Si l installation comprend un clapet de s curit il faut percer un trou d vent d environ 5 mm 3 16 po dans le tuyau de refoulement au de...

Страница 10: ...e puisard est assez large pour avoir de l espace suffisant pour le bon fonctionnement des interrupteurs de commande de niveau 5 ILFAUTtoujoursd brancherl alimentationdelapompeavantdelamanipuler IL FAU...

Страница 11: ...ment le cordon d alimentation lectrique sur le tuyau de refoulement en utilisant du chatterton ou des colliers 6 Utiliser un tuyau de refoulement de pleines dimensions 7 Le puits doit tre conforme tou...

Страница 12: ...nt Longueur du bras d attache Plage de pompage 5 10 15 20 22 9 13 5 18 22 24 127 mm 5 po min 559 mm 22 po max SK305 Interrupteur 20 amps mod les WD et WH min max 011835 INSTRUCTIONS DE BRANCHEMENT TRI...

Отзывы: