manualshive.com logo in svg
background image

 / 9 

2

 

ASSEMBLY PROCEDURE 

 

We recommend that you follow the specific order of the assembly procedure. Proceed step by step 
and refer to the corresponding pages. 

 

PROCEDURE 

PAGE 

SECTION 

1. inventory the elements composing your boat, 
and learn how to recognise them 

CHECK ON UNPACKING 

I - IV 

DESCRIPTION 

2. activate valves into inflating position 

INFLATION SYSTEM 

3. slightly inflate the main buoyancy tube 

INFLATION 

4. install the floor in the boat (except Aero and Rib C) 

3 - 4 

ASSEMBLY 

6. Install the seat 

ASSEMBLY OF EQUIPMENT 

7. finish inflation of the boat to the correct pressure 

5 - 6 / 7 

INFLATION / PRESSURE 

8. Install the oars 

ASSEMBLY OF EQUIPMENT 

 

 

CHECK ON UNPACKING 

 

 

CAUTION

 

 

DO NOT USE A SHARP TOOL 

 

The pack must contain: 1 buoyancy tube + 

 

WAVE 11 

Solid 

 

 

 

 

Floorboard (1) 

 

 

 

 

Inflatable floor (Aero) 

 

 

 

 

Rigid hull 

 

 

 

 

inflatable keel 

 

 

 

 

Stringer 

 

 

 

 

Repair kit 

 

 

 

 

Owner’s manual  (2) 

 

 

 

 

 

Standard equipment 

Carry bag For Boat 

 

 

 

 

Carry bag For Floorboard 

 

 

 

 

Reinforced aluminium oar 

 

 

 

 

High pressure foot-pump 

 

 

 

 

HP electric inflator 

 

 

 

 

Standard foot-pump 

 

 

 

 

Fuel tank strap 

 

 

 

 

Removable wooden seat 

 

 

 

 

 

(1)  Marine Plywood Floor – Number of elements  

(2)  2 volumes   

 

 

 

You can equip your boat with many optional accessories (transportation wheels, boarding ladder, 
lifting rings etc.). Ask your dealer to advise you. 

 

NOTICE : 

IF YOU WISH TO ADD LIFTING RINGS, YOU MUST FIX THEM ON THE 

BUOYANCY TUBE, NEVER ON THE FLOOR

 

Содержание Wave

Страница 1: ...l del Propietario LIRE ATTENTIVEMENT CE MANUEL AVANT LA MISE EN SERVICE DE VOTRE ZODIAC CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR ZODIAC LEGGERE ATTENTAMENTE PRIMA DE INIZIARE IL MONTAGGIO DEL...

Страница 2: ...IONS AND SAFETY RECOMMENDATIONS THAT MUST BE OBSERVED VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHNICAL SPECIFICATIONS ASSEMBLY PROCE...

Страница 3: ...5 6 7 INFLATION PRESSURE 8 Install the oars 8 ASSEMBLY OF EQUIPMENT CHECK ON UNPACKING CAUTION DO NOT USE A SHARP TOOL The pack must contain 1 buoyancy tube WAVE 11 Solid Floorboard 1 5 Inflatable fl...

Страница 4: ...gned fig 4 6 Check that the floorboard is correctly fitted in the angles 7 Flatten the apex by standing on it in the boat and pulling the lifelines to prevent the fabric being pinched fig 2 8 Assemble...

Страница 5: ...9 4 ASSEMBLY WAVE 11 fig 1 A 1 2 3 4 5 6 fig 1 B b floorboard c tube a angle d bottom a b c d fig 2 1 2 3 4 5 6 fig 3 fig 4 7 8 1 2 3 4 5 7 9...

Страница 6: ...Unscrew the valve cap Screw the valve support onto its base screw it tight but without exaggeration not to deteriorate the screw thread and check that the valve cap stays accessible TO DEFLATE Unscre...

Страница 7: ...EEL 240 MBARS 3 48 PSI Inflate the main buoyancy tube and the keel until it becomes difficult to operate correct pressure 240 mb 3 48 PSI reefer to PRESSURE section making sure that each compartment i...

Страница 8: ...ll both drop up to 120 mb 1 7 PSI and YOU WILL HAVE TO INFLATE AGAIN until you regain the lost pressure due to the difference in temperatures Therefore a loss of pressure at the end of the day when am...

Страница 9: ...9 8 ASSEMBLY OF STANDARD EQUIPMENT TO ASSEMBLE AND INSTALL THE OARS THE REMOVABLE SEAT Install the seat before the boat is totally inflated Clic...

Страница 10: ...p the boat around the transom C Start again if you feel there is still some air left in the tubes A B buoyancy tube floor tube deflated C Stow the boat in its bag as follows D Stow the boat folded on...

Страница 11: ......

Страница 12: ...4 m 0 40 ft 1 4 Capacit Capacity Capacit Kapazit t Capacidad ISO 5 Maximum Kg 500 lb 1100 Kg 40 lb 88 3 1 Motorisation Outboard data Motorizzazione Au enbordmotor Motorizaci n L s S Maximum CV 15 Maxi...

Страница 13: ...1 du manuel chapitre Conseils de navigation La portata massima autorizzata calcolata in conformit alla normativa ISO In condizioni di massimo carico si raccomanda di navigare con particolare prudenza...

Страница 14: ...sajeros 13 quille gonflable inflatable keel chiglia gonfiabile Luftkeil quilla hinchable 15 valve de gonflement plancher Aerotec Aerotec air floor inflation valve valvola di gonfiaggio Pagliolato Aero...

Страница 15: ...IV IV DESCRIPTION DESCRIPTION BESCHREIBUNG DESCRIZIONE DESCRIPCI N 8 7 6 10 12 11 5 4 13 3 2 19 24 23 24 26 20 1 21 20 19 9 22...

Страница 16: ...ai de Grenelle 75015 PARIS FRANCE Tel 33 1 41 23 23 23 Fax 33 1 46 48 83 85 Wave by Zodiac ZT03981 Edition 1 Copyright ZODIAC INTERNATIONAL 2011 ZODIAC INTERNATIONAL S A S U au capital de 18 000 000 E...

Отзывы: