background image

4/10 

 

BOAT ASSEMBLY 

 

Illustrations in APPENDIX page A-6 

 

Assemble the boat on a smooth clean surface. 
 

 

If  the  boat  is  stored  in  a  temperature  inferior  to  32°F  (0°C),  before 
unfolding,  let  it  warm  up  for  12  hours  at  room  temperature,  72°F  (about 
20°C). 

 

FLOORBOARD ASSEMBLY

 

 
 

 

Put potato starch at the corner reinforcements (c) (strips between the buoyancy and the 
bottom), to make it easier to place the floorboard elements. 
ATTENTION: NEVER USE TALCUM POWDER 

 

Inspect each element to understand how it will be mounted: 

  The  floorboard  (Fig.  1)  is  composed  of  3  elements  (3),  (4),  (5)  and  2  bow  floorboard 

sections (1), (2). 

  The  order  of  assembly  of  each  element  is  indicated  on  a  label  in  the  upper  right  hand 

corner. 

  The bow floorboard sections have an upside and a down side. The upside is identifiable 

by a label with the sun (8) (Fig. 3). If the label is lost, use the lines on the aluminum 
junction profiles to guide you, they are apparent when assembling. 

 

Lightly inflate the buoyancy tube (this helps the elements to take their place). 

 

Place the bow floorboard (1) into the corner reinforcement (c). 

 

Place the aft element (5) against the transom (6). 

 

Fit in the aft bow floorboard (2). 

 

Place elements (3) and (4) in a pointed “roof” position. 

 

Make sure the elements are lined up straight. 

 

Flatten the “point” by getting into the boat and pulling UP on the grab lines (this prevents the 
fabric from getting pinched (Fig. 2). 

 

Make sure the floorboard (a) is correctly positioned in the corner reinforcement (c). 

 

Position the stringers as indicated below. 

 

PLACING THE STRINGERS

 

 
The  stringers  (7)  (Fig.  3)  are  essential  to  the  seaworthiness  of  the  boat.  They  lock  in  the 
floorboards and assure the rigidity of the entire structure. 
 

 

Never  place  paddles  on  the  bottom  of  the  boat  before  having  flattened 
out the floorboard. It could damage them. 

 

 

After having flattened out the floorboard to position the stringers more easily, if the ground is 
not  level,  slide  the  paddles  under  the  boat  bottom  lengthwise,  at  about  20  cm  (7.8  in.)  on 
either side of the center. (Fig. 3). 

 

Place the stringers (7) along the outside of the floorboard, the indicators (8) always on the 
top (Fig.3). 

 

Make  sure  the  stringers  are  correctly  positioned  between  the  stoppers  (9)  (Fig.  4)  on  the 
floorboard elements (3), (5) (Fig. 4). 

 

The  entire  thickness  of  the  floorboard  must  enter  the  stringer  cavity.  To  do  this,  pivot  the 
stringer back and forth to adjust. Do the same to make the stringers fit into the space in the 
transom corner reinforcement (Fig. 3 and 4).  

 

When  the  boat  is  inflated,  the  interlocking  construction  of  the  floorboard  facilitates  final 
positioning of the stringers. 

Содержание MilPro Grand Raid Series

Страница 1: ...RES BOOTES LESEN SIE DIESES HANDBUCH SORGF LTIG DURCH LEGGERE ATTENTAMENTE IL PRESENTE MANUALE PRIMA DI UTILIZZARE IL BATTELLO ANTES DE UTILIZAR LA EMBARCACI N LEA ESTE MANUAL CON ATENCI N Manuel du P...

Страница 2: ...ould be followed onboard during navigation Volume 2 gives technical specifications and assembly instructions for the boat and its equipment SERIE GRAND RAID MARK 2 MARK 3 SUMMARY Page Page Procedure f...

Страница 3: ...late the buoyancy tube 5 BOAT INFLATION 6 Inflate the keel 5 BOAT INFLATION 7 Adjust the pressures 6 7 AIR PRESSURE 8 Store the boat 8 DEFLATION FOLDING INVENTORY UPON OPENING WARNING DO NOT USE CUTTI...

Страница 4: ...tly the pump should be flat on the ground The boat will inflate rapidly if pumping is done at a regular calm rhythm Use the adapter that corresponds to the diameter of the hose tip valve INFLATION DEF...

Страница 5: ...of position Make sure the elements are lined up straight Flatten the point by getting into the boat and pulling UP on the grab lines this prevents the fabric from getting pinched Fig 2 Make sure the f...

Страница 6: ...tringers before inflating the buoyancy tube see page 4 10 Inflate the buoyancy tube equally inflating each compartment until the needle reaches 240 mbar 3 4 PSI Screw on the valve cap after inflation...

Страница 7: ...ommend pressure 240 mb 3 4 PSI When you launch the boat into 20 C 68 F water the temperature and the internal pressure in the compartments will both decrease as much as 120mb Consequently the boat mus...

Страница 8: ...ng up Inflation deflation valve Take off the cap Inflate to adjust the pressure Screw on the cap IN CASE OF OVERPRESSURE Release some air Inflation deflation valve Remove the cap Release some air by l...

Страница 9: ...Remove all water and dry the boat completely before storage Fold both sides of the buoyancy tube towards the interior Fig 1 bring up the cones against the transom Fig 2 and then fold the boat around t...

Страница 10: ...AT STORAGE AFTER USE To store the boat inflated open the self bailers Rince the boat with fresh water in order to remove any sand seaweed etc Remove all water make sure that no water is left in the bo...

Страница 11: ...ecifications A2 A3 Description A4 A5 Illustrations Assembly of the boat A7 ANHANG Technische daten A2 A3 Beschreibung A4 A5 Illustrations Montage des bootes A8 ALLEGATO Caratteristiche techniche A2 A3...

Страница 12: ...CIT CAPACIDAD ISO 7 9 Maximum Kg 910 1220 lb 2006 2690 Kg 86 110 lb 190 243 3 1 5 1 CERTIFICATION AUSLEGUNGSKATEGORIE CATEGORIA DE DISE O CERTIFICACI N 94 25 CE C MOTORISATION OUTBOARD DATA AU ENBORDM...

Страница 13: ...are see Technical Specifications Die zul ssige Nutzlast wurde gem ISO Normen berechnet Fahren mit oder nahe der zul ssigen Nutzlast ist nur empfehlenswert in ruhigem Wasser und mit reduzierter Geschwi...

Страница 14: ...A4 DESCRIPTION BESCHREIBUNG DESCRIZIONE DESCRIPCION...

Страница 15: ...ior 10 Plaque support moteur Engine mount plate Motortragplatte Piastra supporto motore interna Placa soporte motor 11 Saisines Grab lines Bootskrabber Cima tientibene Guirnaldas 12 Plancher aluminium...

Страница 16: ...on it to push boards down 1 2 3 4 5 6 Floorboard male female assembly Fig 1 A Fig 1 B a floorboards b hull main buoyancy tubes c corner reinforcement d bottom hull Sun decal sticker 8 found on stringe...

Страница 17: ...32 bis boulevard Haussmann 75009 PARIS Z65047 Octobre 2013 ZODIAC MILPRO INTERNATIONAL...

Отзывы: