
MUT300082E1R1 — 02 – 2017
7
INST
ALL
A
TION
3.
INSTALLATION
3.1
Introduction
This section provides information for installation of the PRO/EXT module.
3.2
Mechanical installation
3.2.1
PRO Assembly
Follow these instructions to assemble a mezzanine board in a PRO module:
1.
Prepare your mezzanine board by soldering the power and I/O wires
2.
Install your mezzanine board in the PRO module
3.
Solder the power wires (if needed).
4.
Fit the I/O connector with contacts and wires
5.
If waterproofness is required for your electronics, consider using filling material.
Refer to
Notes:
◆
If waterproofness is required, you must equip each of the 51 pins with a contact
◆
The I/O connector can be unscrewed from the module to ease operation.
◆
The I/O connector locks must be screwed using a proper torque limiting tool (45cm.N).
Содержание EXT
Страница 1: ...Prototyping Extension Modules User s Manual Document No MUT300082E1R1 02 2017 PRO EXT ...
Страница 10: ...6 PRO EXT User s Manual User defined electronic board T H I S P A G E I S I N T E N T I O N A L L Y B L A N K ...
Страница 20: ...16 PRO EXT User s Manual eZ software installation T H I S P A G E I S I N T E N T I O N A L L Y B L A N K ...
Страница 22: ...18 PRO EXT User s Manual Troubleshooting and status T H I S P A G E I S I N T E N T I O N A L L Y B L A N K ...
Страница 24: ...20 PRO EXT User s Manual Input Output connector T H I S P A G E I S I N T E N T I O N A L L Y B L A N K ...
Страница 26: ...22 PRO EXT User s Manual Service T H I S P A G E I S I N T E N T I O N A L L Y B L A N K ...
Страница 28: ...24 PRO EXT User s Manual T H I S P A G E I S I N T E N T I O N A L L Y B L A N K ...
Страница 29: ...Notes ...