5
EN
2. Installati on
2.1 Preparing the pool: water balance
These appliances are designed to disinfect pool water using the salt water chlorinati on functi on.
It is essenti al that the water balance and salinity (4 g/L) are checked and adjusted before installing the appliance. Making
sure that the water balance and salinity are correct from the very start will reduce the likelihood of encountering problems
on the fi rst days of operati on or during the season the pool is in use.
Even though it is an autonomous system, it is essenti al to regularly analyse the water to check the water
balance parameters and adjust them if necessary.
Unit
Recommended
values
To increase
To reduce
Test frequency
(in the season)
pH
/
7.2 – 7.4
Add pH+ or use
automati c regulati on
Add pH- or use
automati c regulati on
Weekly
Free chlorine
mg/L
or ppm
0.5 – 2
Increase chlorine
producti on or use BOOST
mode (Ei² Expert only)
Reduce chlorine
producti on
Weekly
TA
(alkalinity or
buff er power)
°f
(ppm)
8 – 15
(80 – 150)
Add alkaline corrector
Add hydrochloric acid
Monthly
TH
(level of calcium
carbonate)
°f
(ppm)
10 – 30
(100 – 300)
Add calcium chloride
Add a calcium carbonate
sequestering agent or
carry out carbonate
removal
Monthly
Cyanuric
acid
(stabiliser)
mg/L
or ppm
< 30
Only add cyanuric acid if
necessary
Parti ally empty the pool
and refi ll it
Quarterly
Salinity
g/L or
kg/m³
4
Add salt
Leave as such or
parti ally empty the pool
and refi ll it
Quarterly
Metals
(Cu, Fe, Mn…)
mg/L
or ppm
± 0
/
Add metal sequestering
agent
Quarterly
2.2 Installing the control box
•
The control box must be installed in a dry venti lated technical room protected against frost, with no pool maintenance
products stored nearby.
•
The control box must be installed at a distance of at least 2.0 m from the outside edge of the pool. Any additi onal local
legislati on in force concerning the installati on of the control box in the country concerned must be complied with.
•
It must not be installed more than 1.5 metres from the cell (maximum cable length).
•
If the box is fi xed to a post, a waterti ght panel must be fi xed behind the control box (350x400 mm minimum).
•
Fix the support solidly to the wall or the waterti ght panel, and place the control box on it using the screws provided.
Содержание Ei2 Expert
Страница 2: ......
Страница 143: ...1 EL 8 48...
Страница 144: ...2 30 mA...
Страница 155: ...13 EL 3 2 6 c Ei Expert 5 4 4 1 backwash 5 Ei GenSalt OE Ei Expert timers 4 2 15 1 9 3 2 6 b 4 3 10 C...
Страница 157: ......
Страница 158: ......
Страница 159: ......