4.5 Manual start-up

In addition to operating via the timer, the Ei can also be started and stopped manually by pressing the 

 key.

The appliance will then operate until the next ‘OFF’ stop time if no production time period has been 
specifi ed, then will switch back to the programmer’s mode. This function may be very useful to conduct 

some tests.

WARNING:

 The Ei chlorinator is fi tted with a safety mechanism in order to prevent excess chlorine 

production which automatically cuts off production if the production period exceeds 30 continuous 
hours.
If the Ei appliance is started manually and no stop time has been programmed (continuous fi ltration 
activation), the appliance will operate without any interruption for a 30 hours maximum time period, 
then it will turn the power off automatically (‘OFF’) in order to avoid an overload of chlorine.

4.6 External clock use (fi ltration control box)

In some cases, it may be necessary to link the Ei appliance to an external clock (coupled to the fi ltering 
system). In this case, the chlorine production can only be carried out within fi ltering operational times

Process:

1.    Start the pool fi ltering system in order to start the Ei chlorinator (5 second initialisation)

2.  Turn on the Ei chlorinator 

 key) and set the chlorine production level you need (

 key). See 

the 

Setting chlorine production 

below.

3.  Set the external clock (fi ltering command box) in order to programme the operating times.

NOTE

:  It is strongly recommended to use the programmer (timer) even when the Ei chlorinator is 

controlled by the fi lter system. This will avoid the triggering of the “excess production” safety device 
when the fi ltering system is switched on for long periods.

4.7 Setting chlorine production

1.   Turn on the Ei chlorinator by pressing the 

 key.

2.  Press the 

 key to adjust the level of chlorine production. The minimum release level corresponds 

to the fi rst green visual indicator (approximately 20%) and the increments (Green visual 
indicators) are per additional 20% units, one at a time, up to the maximum (4 green indicators lit 
simultaneously).

3.  If you maintain the 

 key pressed and exceed the maximum, the chlorine production level will drop 

back to the minimum (orange indicator).

NOTE:

 The chlorine production level display indicates a setting and does not correspond to the ‘real’ 

chlorine production, as it only expresses a desired level of production.
The production level corresponds to a percentage of the operating cycle, as, for example: 
> 1

st

 orange indicator lit (20%) = 2 minutes of production, 8 minutes of pause

> 3 green indicators lit (80%) = 8 minutes of production, 2 minutes of pause.

!

!

!

28

Содержание EI2 Expert 18SWC EU VS

Страница 1: ...Instructions for installation and use to be kept in a safe place English page 19 EN...

Страница 2: ...er pack connection 25 Ei salt chlorinator parametering page 25 4 1 Ei power pack description 25 4 2 Language selection 26 4 3 Setting the clock clock 26 4 4 Setting the timer 27 4 5 Manual start up 28...

Страница 3: ...r te on adapter adapter ring 4 1 x reducer for DN 50 mm piping Installed in the ring of the Ei cell 5 1 x reducer for 1 1 2 piping with pressure seal UK English version 6 1 x Ei cell with Quick Fix ho...

Страница 4: ...n of ammable gases resulting in re or explosion Keep equipment out of the reach of children A damaged supply cord should only be replaced by the manufacturer authorized service agent or an electrician...

Страница 5: ...ocation for the power pack mount It should be installed no further than 1 8 metres from the cell this is the maximum cell cable length ideally in the technical shed with the ltering system or next to...

Страница 6: ...move the adapter for DN50 piping inserted in the lower part of the adapter ring 4 Place the lower part of the Ei cell clamp on the location where you wish to install the pipe Important place the clamp...

Страница 7: ...ck on the Ei electrode and slide the wire in the slot designed for this purpose located on the side of the electrode 8 3 3 Flow meter installation The ow meter and its paddle clamp DN50 mm must be ins...

Страница 8: ...o the pool lter system appliance only connected when the ltering is operational Le rst possibility above is the preferred electric connection Once the connections are completed successfully and glue i...

Страница 9: ...t power supply or forced operation This will ensure that the internal accumulator will be suf ciently charged to store in memory all the operating parameters 1 Turn power on 2 Wait until the successfu...

Страница 10: ...is set press the key in order to move on to the OFF time setting TIMER 1 OFF will be displayed 5 Repeat steps 2 and 3 to set the stop time 6 If you need to set a different time period press the key a...

Страница 11: ...ion 2 Turn on the Ei chlorinator key and set the chlorine production level you need key See the Setting chlorine production below 3 Set the external clock ltering command box in order to programme the...

Страница 12: ...e key The Ei appliance will return to the default LCD screen WARNING users of Jandy REV L or more recent versions It is essential that the external controller setting be set to JANDY L M if a Jandy Aq...

Страница 13: ...g wiring for the cable to be connected to the green terminal strip 5 of the Ei chlorinator Polaris EOS Jandy Aqualink Controllers Green wire 0V on the 0V terminal of the Ei Red wire V on the POS termi...

Страница 14: ...mperature is too low The orange SALT indicator is lit Possible causes Lack of salt 4 g L due to water loss or dilution lter backwash change of water rain leakage The pool water temperature is too low...

Страница 15: ...ate an error but is displayed for information purposes only Solution Wait for about 10 minutes and the chlorine production will resume automatically at the set levels Safety The installation and use o...

Страница 16: ...ocal waste collection centre never pour it into the rainwater drain or into the sewers 5 Rinse the electrode in clean water and replace it in the cell body there is an alignment failsafe 6 Replace the...

Страница 17: ...he User Manual to lack of maintenance and or a handling accident to in correct storage and or by studies instructions and or speci cations made by our Client Any modi cations made by the Client by the...

Страница 18: ...ementare mettetevi in contatto con il vostro rivenditore al dettaglio Contacte o seu revendador para obter informa oes mais detalhadas Voor nadere inlichtingen kunt u zich wenden tot uw zwembadbouwer...

Отзывы: