
18
❸ Installing a pH Link or Dual Link module
3.1 I Installing the module
• Turn the appliance off. Before beginning, disconnect all potential power supplies to the
appliance.
•
Close the isolating valves in the pipework.
•
Remove the cover and unscrew
(x2) the bottom module,
see figure .
•
Remove the
module,
see figure
.
•
Connect the 2 cables
"SENS"
and
"PUMP"
of the pH Link or Dual Link module to the chlorinator's terminals,
see figure
.
•
Position the module on the chlorinator according to step
and screw (x2) according to step
,
see
figure
.
•
Replace the cover,
see figure .