2 / 10
ASSEMBLY PROCEDURE
The boat assembly procedure follows an order you must respect. Proceed step by step,
referring each time to the pages indicated for explanations.
PROCEDURE
PAGE
SECTION
1. Make an inventory of the parts of the boat and get to
know them.
2
CHECK ON UNPACKING
I - IV
DESCRIPTION
2. Activate the valves in inflating position
5
INFLATION SYSTEM
3. Slightly inflate the main buoyancy tube
7
INFLATING THE BOAT
4. Assemble the floorboard (according to chosen
option)
3 - 4
ASSEMBLY
5. Finish inflation of the boat to the correct pressure
7
INFLATING THE BOAT
8
PRESSION
6. Install equipment
V - VI
ASSEMBLY OF EQUIPMENT
CHECK ON UNPACKING
ATTENTION
DO NOT USE A SHARP TOOL
(CUTTER, KNIFE, ETC.)
The pack must contain: 1 buoyancy tube +
ZODIAC CLASSIC
MARK 1
MARK 2C
MARK 2
Owner’s manual (2 volumes)
✓
✓
✓
Repair kit
✓
✓
✓
Standard equipment
Paddles
2
2
2
Pressure gauje
1
1
1
Foot-pump
✓
✓
✓
Mast and pennant
1
1
1
Bow bag
✓
✓
✓
Carrying bag
2
2
2
You can equip your boat with many optional accessories (transportation wheels, ladder, lifting
rings etc.). Ask your dealer to advise you.
NOTE:
IF YOU WISH TO ADD LIFTING RINGS (FOR PLACING ON THE DAVIT),
YOU MUST FIX THEM ON THE BUOYANCY TUBE, NEVER ON THE
FLOOR.
Содержание CLASSIC MARK 1
Страница 6: ...6 10 INFLATION SYSTEM PRESSURE INDICATOR...
Страница 9: ...9 10 E N G L I S H...