background image

2 / 10 

 

ASSEMBLY PROCEDURE 

 
The  boat  assembly  procedure  follows  an  order  you  must  respect.  Proceed  step  by  step, 
referring each time to the pages indicated for explanations.

 

 

PROCEDURE 

PAGE 

SECTION 

1. Make an inventory of the parts of the boat and get to 
know them. 

CHECK ON UNPACKING 

I - IV 

DESCRIPTION 

2. Activate the valves in inflating position 

INFLATION SYSTEM 

3. Slightly inflate the main buoyancy tube 

INFLATING THE BOAT 

4.  Assemble  the  floorboard  (according  to  chosen 
option) 

3 - 4 

ASSEMBLY 

5. Finish inflation of the boat to the correct pressure 

INFLATING THE BOAT 

PRESSION 

6. Install equipment 

V - VI 

ASSEMBLY OF EQUIPMENT 

 
 

CHECK ON UNPACKING 

 

 

ATTENTION

 

DO NOT USE A SHARP TOOL 

(CUTTER, KNIFE, ETC.) 

 
The pack must contain: 1 buoyancy tube + 
 

ZODIAC CLASSIC

 

MARK 1 

MARK 2C 

MARK 2 

Owner’s manual (2 volumes)

 

 

 

 

Repair kit 

 

 

 

 

Standard equipment

 

 

 

 

Paddles 

Pressure gauje 

1

 

1

 

1

 

Foot-pump 

 

 

 

Mast and pennant 

1

 

1

 

1

 

Bow bag 

 

 

 

Carrying bag 

2

 

2

 

2

 

 
 
You can equip your boat with many optional accessories (transportation wheels, ladder, lifting 
rings etc.). Ask your dealer to advise you.

 

 

 

NOTE: 

IF YOU WISH TO ADD LIFTING RINGS (FOR PLACING ON THE DAVIT), 

YOU  MUST  FIX  THEM  ON  THE  BUOYANCY  TUBE,  NEVER  ON  THE 

FLOOR. 

 

Содержание CLASSIC MARK 1

Страница 1: ...PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHNICAL SPECIFICATIONS ASSEMBLY PROCEDURE ZODIAC CLASSIC MARK 1 MARK 2C MARK 2 CONTENTS Page Page Assembly procedure 2 Pressure 8 Check on unpacking...

Страница 2: ...Y 5 Finish inflation of the boat to the correct pressure 7 INFLATING THE BOAT 8 PRESSION 6 Install equipment V VI ASSEMBLY OF EQUIPMENT CHECK ON UNPACKING ATTENTION DO NOT USE A SHARP TOOL CUTTER KNIF...

Страница 3: ...on fig 1 4 Fit all sections together fig 1 5 Position sections 3 and 4 as an apex in a tent like position fig 1 and 2 6 Check that all sections are correctly aligned fig 4 7 Flatten the apex by standi...

Страница 4: ...4 10 ASSEMBLY fig 1 A fig 1 B a floorboard b buoyancy tube c angle d bottom fig 2 1 5 4 2 3 6 fig 3 fig 4 7 8 1 2 3 4 5 7 9 a b c d...

Страница 5: ...rt onto its base screw it tight but without exaggeration not to deteriorate the screw thread and check that the valve cap remains accessible To deflate Unscrew the valve insert from its base 1 2 3 SEM...

Страница 6: ...6 10 INFLATION SYSTEM PRESSURE INDICATOR...

Страница 7: ...aler 1 INFLATING THE BUOYANCY MECHANISM Place the adapter corresponding to the diameter of the semi built in valve at the inflator pipe nozzle Inflate the buoyancy mechanism balancing the pressure bet...

Страница 8: ...ch it temperature 20 C the temperature and internal pressure of the inflatable compartments will drop simultaneously up to 120 mb and YOU WILL THEN NEED TO REFLATE until you regain the millibars lost...

Страница 9: ...9 10 E N G L I S H...

Страница 10: ...rage 6 Fold in the 2 sides of the main buoyancy tube A fold the cones onto the transom then roll up the boat around the transom C Start again if you feel there is still some air left in the tubes A B...

Отзывы: