manualshive.com logo in svg
background image

 
 
 
 
 
 
 

                    

 

 
 
 
 
 

 

Tome 2 - Volume 2 

Teil 2 - Tomo 2 

 
 

CADET 

 

CADET ROLL UP 

 200 - 240 - 260  

CADET SOLID 

 260 - 285 - 310 

 340  

 

ZT03744 

 Edition 17 

 
 

Содержание CADET ROLL UP 200

Страница 1: ...Tome 2 Volume 2 Teil 2 Tomo 2 CADET CADET ROLL UP 200 240 260 CADET SOLID 260 285 310 340 ZT03744 Edition 17...

Страница 2: ...COMMENDATIONS THAT MUST BE OBSERVED VOLUME 2 DEALS WITH TECHNICAL SPECIFICATIONS AND ASSEMBLY PROCEDURE OF THE BOAT AND ITS EQUIPMENT VOLUME 2 TECHNICAL SPECIFICATIONS ASSEMBLY PROCEDURE ZODIAC CADETS...

Страница 3: ...f the boat to the correct pressure 7 8 INFLATION PRESSURE 7 Install the oars 9 ASSEMBLY OF EQUIPMENT CHECK ON UNPACKING CAUTION DO NOT USE A SHARP TOOL The pack must contain 1 buoyancy tube Cadet Roll...

Страница 4: ...Check that the floorboard is correctly fitted in the angles 7 Flatten the apex by standing on it in the boat and pulling the lifelines to prevent the fabric being pinched fig 2 8 Assemble the stringer...

Страница 5: ...10 4 ASSEMBLY fig 1 A 1 2 3 4 5 6 fig 1 B a angle b floorboard c tube d bottom a b c d fig 2 1 2 3 4 5 6 fig 3 fig 4 7 8 1 2 3 4 5 7 9...

Страница 6: ...LL UP 200 240 INSTALL THE SLATTED FLOOR Boat deflated slide the slats in their pockets starting by the closest to the transom If the slats are difficult to insert lubricate it with liquid soap CADET R...

Страница 7: ...the valve insert from its protection Unscrew the valve cap Screw the valve support onto its base screw it tight but without exaggeration not to deteriorate the screw thread and check that the valve ca...

Страница 8: ...the pump hose end piece Inflate pressure 240 mb refer to PRESSURE section making sure that each compartment is equal When correctly inflated the internal bulkheads a are not visible NEVER COMPLETELY I...

Страница 9: ...al temperature and pressure of the tubes will both drop up to 120 mb 1 7 PSI and YOU WILL HAVE TO INFLATE AGAIN until you regain the lost pressure due to the difference in temperatures Therefore a los...

Страница 10: ...10 E N G L I S H 9 ASSEMBLY OF STANDARD EQUIPMENT TO ASSEMBLE AND INSTALL THE OARS THE REMOVABLE SEAT EXCEPT C 200 ROLL UP Install the seat before the boat is totally inflated Clic...

Страница 11: ...in buoyancy tube A fold the cones onto the transom then roll up the boat around the transom C Start again if you feel there is still some air left in the tubes A B buoyancy tube floor tube deflated C...

Страница 12: ...N DESCRIPTION DESCRIPTION DESCRIPTION DESCRIPTION DESCRIPTION DESCRIPTION BESCHREIBUNG BESCHREIBUNG BESCHREIBUNG BESCHREIBUNG DESCRIZIONE DESCRIZIONE DESCRIZIONE DESCRIZIONE DESCRIPCI N DESCRIPCI N DE...

Страница 13: ...6 1 4 1 6 1 4 1 6 1 4 1 6 1 6 1 8 Capacit Capacity Capacit Kapazit t Capacidad ISO 2 3 3 1 3 1 4 5 5 1 Maximum Kg 190 250 300 370 400 450 750 lb 419 551 661 815 881 992 1653 Kg 19 23 30 35 36 39 49 lb...

Страница 14: ...du manuel chapitre Conseils de navigation La portata massima autorizzata calcolata in conformit alla normativa ISO In condizioni di massimo carico si raccomanda di navigare con particolare prudenza P...

Страница 15: ...n slats 200RU 240RU Pagliolato a listelli 200 RU 240 RU herausnehmbarer Lattenboden 200 RU 240 RU tabillas extraibles 200 RU 240 RU Plancher d roulant C260 RU Rolling floor C260 RU pagliolato avvolgib...

Страница 16: ...IV IV DDESCRIPTION BESCHREIBUNG DESCRIZIONE DESCRIPCI N CADET SOLID 260 S 285 S 310 S 340 S 1 2 14 3 4 13 12 5 6 7 15 8 9 CADET ROLL UP 200 RU 240 RU 260 RU 6 17 16 9 18 10 8 10 11 18...

Страница 17: ...2 chemin de la Val Priout 31450 AYGUESVIVES FRANCE Cadets Solid Roll up Code ZT03744 Edition 17 Copyright Z NAUTIC 2015 Z NAUTIC S A S U au capital de 7 000 000 Euros R C S PARIS 812 206 340...

Отзывы: