the last piece of equipment before the return
inlet to the pool, on a pipe segment at least 16
inches long. The cell must be mounted upright
on pipe which runs within
±
5
º
of level (parallel
to the ground). The cell cannot be mounted on
a vertical, or sloping pipe.
2.
Make the appropriate cuts in the pipe where
you will be installing the cell. The gap between
the cuts should be 36.83 cm (14.50 inches).
NOTE
If the flow direction of the water does not
match the arrows on the housing, the cell will
malfunction.
3. Let the system dry per instructions provided by
the cement manufacturer.
4. When the cement is dry, install the cell using
the unions. Confirm that the flow indication
arrows on the transparent lid correspond with
the flow direction of the water in the plumbing
system.
5. Start the system and check for proper water
flow.
WARNING
To avoid property damage, serious injury or death,
do not operate the electrolytic cell without water
circulation or if cell housing is damaged or
improperly assembled.