Zodiac Pool Systems Jandy Pro Series Levolor Скачать руководство пользователя страница 10

Section 3. Installation Instructions

3.1  Materials and Tools

Installation Materials Supplied for 

Levolor

®

 Models K-1100, LX2, or 

LEV110CK/2G

Qty

Sensor with Wire

1

Solenoid Valve

1

Coupler

1

Control Box

1

Remote Sensor Housing

1

Hardware Kit 

1

        Grease-Filled Wire Nuts for Valve

2 per kit

        Screws

4 per kit

        Anchors

4 per kit

Owner’s Manual - Warranty Information

1

Installation Materials Furnished for 

Levolor II, Model K-2300

Qty

Sensor with Wire

2

Solenoid Valve

2

Coupler

2

Control Box

1

Remote Sensor Housing

2

Hardware Kit

2

        Grease-Filled Wire Nuts for Valve 

2 per kit

        Screws 

4 per kit

        Anchors 

4 per kit

Owner’s Manual - Warranty Information

1

Additional Materials Needed for Installation

Anti-siphon Valve*
2-Conductor, 18-Gauge Solid-Core Burial Cable
Wire Nut Connectors for the Sensor and Power 

Connections

*The anti-siphon valve is not necessary if the 

connection is made from the irrigation system.

Open the box and check to see that it contains the 

contents listed above. If it does not, contact your dealer 

or Zodiac technical support at (800) 822-7933.

3.2   Installing the Control Box

NOTE  When installing a Levolor

 

on a spa (less than 

300 sq ft of surface area), turn the flow control 
down to reduce the flow rate of the valve.

Models K-1100, K-2300, and LEV110CK/2G

1.  Mount the control box to the wall near the pump 

and filter. See Figure 1. 

Do not install the control 

box within 10 ft (3 m) of the pool edges.

2.  Mount the control box at eye level. Leave 

sufficient clearance on all sides of the chassis 

backplate.

3.  Check the source voltage.

 

(All three (3) units are 

factory wired for 220 volt operation.) To modify 

the wiring for 110 volt operation, see 

Section 3.3

.

4.  For 220 volt operation, connect the black wire to 

line 1 and connect the black wire with the yellow 

stripe to line 2. See Figure 4.

Model LX2

1.  Mount the control box in the static pipe where the 

sensor is installed. See Figure 2.

2.  Check the source voltage.

 

(There are separate units 

for 220 and 110 volt operation.) 

 

a.  For 220 volt operation, connect one (1) of the 

black wires to line 1 and the other black wire to 

line 2. See Figure 7. 

 

b. For 110 volt operation, connect the white wire 

to the white neutral line. Then connect the black 

wire to the black power line. See Figure 8.

Page 10

ENGLISH

Jandy Pro Series Levolor

®

 Electronic Water Leveler 

Models K-1100, LX2, K-2300, and LEV110CK/2G      

  

|

   Installation and Operation Manual

Содержание Jandy Pro Series Levolor

Страница 1: ...ersonal injury or death Improper installation and or operation will void the warranty Improper installation and or operation can create unwanted electrical hazard which can cause serious injury proper...

Страница 2: ...Page 2 ENGLISH Jandy Pro Series Levolor Electronic Water Leveler Models K 1100 LX2 K 2300 and LEV110CK 2G Installation and Operation Manual...

Страница 3: ...grams 13 Section 4 Operation 16 4 1 K 1100 LEV110CK 2G and LX2 16 4 2 K 2300 17 4 3 Fill Safety Lockout Mode 17 4 4 Fill Time before Lockout 18 Section 5 Troubleshooting 19 5 1 Manual Valve Override 1...

Страница 4: ...in pool spa installation and maintenance Improper installation or operation could cause serious injury property damage or death Improper installation or operation will void the warranty WARNING Before...

Страница 5: ...ntrol Box The control boxes for K 1100 LX2 and LEV110CK 2G have three 3 LED displays Power Sensor and Filling The control box for the K 2300 has five 5 LED displays Power Sensor I Filling I Sensor II...

Страница 6: ...iled views of the factory direct wiring for 220 VAC and the modified wiring for 110 VAC The section also contains a wiring diagram for the LX2 along with detailed views of the factory direct wiring fo...

Страница 7: ...Operation BLK RED BLK Green Transformer 1 2 5 6 Ground Line Neutral BLK WHT BLK YEL 220 Volt Operation 110 Volt Operation Figure 5 K 1100 K 2300 and LEV110CK 2G Modified Wiring for 110 Volt Operation...

Страница 8: ...ts Black Green Black Figure 6 LX2 Control Box See Figure 7 for factory direct wiring for 220 volt operation and Figure 8 for factory direct wiring for 110 volt operation Figure 7 LX2 Factory Direct Wi...

Страница 9: ...ing Valve II Red Wires Filling Valve I Blue Wires Yellow Wire to Sensor Common Sensor Common Yellow Wire Sensor I Sensor II Black Wire Red Stripe Black Wire White Stripe Black Wire Yellow Stripe Black...

Страница 10: ...Box NOTE When installing a Levolor on a spa less than 300 sq ft of surface area turn the flow control down to reduce the flow rate of the valve Models K 1100 K 2300 and LEV110CK 2G 1 Mount the control...

Страница 11: ...d on the inlet side of the valve A 24 VAC solenoid valve will provide water from a supply line to the pool or spa You can install the supply line either before or after the filter at the equipment pad...

Страница 12: ...slip sensor vertically in a static pipe Glue the sensor to the coupling See Figures 14 and 16 NOTE Screw the optional threaded sensor into a 1 threaded coupling NOTE When using the static pipe method...

Страница 13: ...on Sensor in Skimmer Installation in Exisiting Pool Figure 16 Slip Sensor in Static Pipe Installation in New Pool 3 7 Installation Diagrams This section shows diagrams of skim half moon style and slip...

Страница 14: ...onnection 1 PVC Cut to Length 2 Static Line Vented at Top by Drilling Hole in It Terminate Sensor at Minimum Operating Level Conduit to Sensor Control System at Control Box 9 Deck Lid 6 Figure 19 Deck...

Страница 15: ...E Install Line Level or Run Uphill From Pool to Prevent Air Lock 1 Brass Y Strainer 110 220 VAC Figure 20 LX2 in Static Pipe Installation in New Pool Desired Water Level 1 Coupling Slip Sensor 1 PVC C...

Страница 16: ...t takes longer to fill the pool than the time period allotted 20 40 or 60 minutes For more information see Section 4 3 Fill Safety Lockout Mode NOTE The time period allotted for the LEV110CK 2G to fil...

Страница 17: ...Filling II light turns green indicating that Valve II is operational and filling The light turns off when the spa is filled and it turns red when Valve II goes into Safety Lockout Mode Note that the K...

Страница 18: ...er S 1 See Figure 27 for location of LEV110CK 2G jumpers Model K 2300 The K 2300 factory set Fill time before Lockout is 20 minutes for both Filling I and Filling II To modify fill times cut jumpers a...

Страница 19: ...connect Valve I from the blue wires in the control box and disconnect Valve II from the red wires in the control box 4 Restore power to the control box and observe the operation The control box is wor...

Страница 20: ...h poly pro jacket 3 Valve is bad PCB board is bad Sensor is bad Does green fill light turn off Does green fill light turn off Is fill light on Disconnect blue valve wires from control box Does green f...

Страница 21: ...nection between valve and controller is bad Less power Verify correct input voltage to unit Pull sensor out of water Does sensor light turn on YES YES YES YES YES YES YES NO NO NO NO NO NO NO Does uni...

Страница 22: ...ded Style 2 Contact w 200 ft K 1100 K 2300 S2042G 9 Threaded Style 2 Contact w 50 ft 30 Sensor K 1100 K 2300 S2042A30 Skim Half Moon Style Skimmer Install 10 Half Moon Style 2 Contact w no wire K 1100...

Страница 23: ...ft K 1100 LX2 K 2300 S2046K 11 Dual Style Sensor w 350 ft K 1100 LX2 K 2300 S2046M 11 Dual Style Sensor w 400 ft K 1100 LX2 K 2300 S2046O 11 Dual Style Sensor w 450 ft K 1100 LX2 K 2300 S2046Q 11 Dual...

Страница 24: ...ystems com 2016 Zodiac Pool Systems Inc ZODIAC is a registered trademark of Zodiac International S A S U used under license All trademarks referenced herein are the property of their respective owners...

Отзывы: