• It is recommended that the pod and cell be installed 0.25 m (10 in.) from any 90° elbow.
3.3 Install the Power Pack, Cell, and Pod
WARNING
If you are installing a Zodiac AquaPure Ei Series APURE35PLGC to Goldline adaptor, it is necessary to disconnect the power to
the Goldline controller.
Zodiac recommends that any procedure requiring potential contact with live electrical wiring and/or parts other than cords and
plugs connected to electrical outlets be completed by a contractor who is licensed and qualified in pool equipment as described on
the front cover of this manual. Failure to follow warning notices and instructions may result in property damage, serious injury, or
death.
WARNING
The Canadian Electrical Code (CEC) requires that pool equipment be bonded to each other. Make sure to check your local
codes to determine if the CEC, and/or other local installation codes are enforced by the Authority Having Jurisdiction
(AHJ). A solid copper bonding wire 13.3 mm2 (6 AWG) is included with this product for bonding the power pack to a
permanent bonding connection. Refer to your locally enforced codes for the acceptable bonding wire gauge.
To avoid property damage, serious injury or death, NEVER use the chassis backplate of the power pack to ground any
other equipment.
1.
Ensure correct placement of the cell and the power pack will meet all the installation requirements outlined in
Section 3.2.
2.
Screw the power pack bracket into position on a wall surface where it will mount securely, while ensuring it is no
more than 4.6 m (15 ft.) from the cell (see Figure 4 and 5).
3.
Position the power pack in place by aligning the bracket with the corresponding thru-holes (see Figure 5).
4.
Unscrew the locking ring from the cell and the pod in order to extract them from the lower clamp (see Figure 6).
5.
Press the two (2) push-buttons on either side of the upper clamp to separate the upper clamp from the lower clamp
(see Figure 6).
6.
Invert the lower clamps and place on the pipe. Mark the pipe for drilling the feeder holes (see Figure 7).
7.
Drill the feeder holes using the hole saw provided. Ensure holes are clean and smooth (see Figure 8).
8.
Use the pipe spacer as shown if mounting on a 40 mm (1½ in.) pipe (see Figure 9).
NOTE
The pipe spacer is required for 40 mm (1 ½ in.) diameter pipe only. The spacer is not required on
50 mm (2 in.) pipe.
9.
Verify the gasket is attached to the upper clamp. The curved side of the gasket must be pointing down so that it
will create a seal with the pipe.
10.
Secure the clamps, pipe spacer, and gasket around the pipe as shown (see Figure 10)
making sure the flow
arrows on the clamp point in the direction of the water flow
(see Figures 11 and 12). Make sure the two (2)
clips on the sides of the clamp are snapped into place.
11.
Insert the o-ring into the channel on each of the clamps (see Figure 12).
12.
Install the cell and the pod making sure the pod is installed upstream from the cell. When installing the pod, make
sure the flow switch is inserted into the inlet port on the clamp (see Figure 13).
13.
(see Figure 14).