
27
Gas Con
ver
sion Pr
ocedur
e
INSTALLATION
Orifice
STEP E:
Set the natural gas orifice aside
and replace with the liquid
propane gas orifice. Screw in and
tighten the new orifice.
STEP F:
Place the burner vent back into
position over the new orifice in
the AR3 slot.
STEP G:
Secure the burner back in place
with the mounting screw that was
removed in step B.
STEP H:
Follow steps B through G with the
bottom burner. Ensure the orifices
and burners are secured properly.
When finished, replace drip pan
and sliding racks.
Orifice