background image

 

 
2.

 

Insert the arms to the connection points, and use the 
Hex  key  to  fasten  the  four  countersunk  screws  on 
each arm, as shown in figure 2-2. 

 

 
 
 
 
 
 
 
 
 
 

Figure 2-2 

2.2 Power-on Test Before the Installation of Device 

1.

 

Please make sure that the power requirements are strictly met to avoid permanent damage to the unit. You could change the input 
voltage 110V or 220V through the DIP switch, as shown in figure 2-3. 

Note:

 The tripod turnstile must be connected to ground (earth). 

2.

 

Power on and wait 30s for the tripod turnstile to finish the self-check program. 

3.

 

Lift the arms manually, as shown in figure 2-4. 

4.

 

Check whether the tripod turnstile and the LED indicators work properly. 

If there is any problem, please refer to section 4.2 or kindly contact the supplier. 

220
110

La

be

l

Wiring 

terminal

D

IP

 sw

itc

h

Li

ft

 u

pw

ar

ds

 

Figure 2-3                                                                        Figure 2-4                                                                                                   

3. Equipment Installation 

3.1 Installation Conditions 

The equipment must be installed on concrete ground, ensuring that expansion bolts can be secured firmly. 
You are suggested to install an assistant framework or fence to form a passageway, as shown in figure 3-1. 

500

320

1320

A

ss

ist

an

fra

m

ew

or

k

80

80

 

 

Figure 3-1 

Tighten the four screws on each 

arm in clockwise direction.

Содержание TS2200 Series

Страница 1: ...ght 65kg Operating Humidity 5 85 Gross Weight 75kg Flow Rate 25 48 passages minute Dimension mm Figure 1 L 1110 W 320 H 980 Input Control Signal Dry contact Package Size mm L 1200 W 440 H 1080 1110 98...

Страница 2: ...turnstile to finish the self check program 3 Lift the arms manually as shown in figure 2 4 4 Check whether the tripod turnstile and the LED indicators work properly If there is any problem please ref...

Страница 3: ...to Ground earth there is wiring interface in the power switch Figure 3 3 3 3 Installation 1 Drilling holes Drill holes based on the locations of the holes shown in figure 3 3 2 Fix the mounting plate...

Страница 4: ...ive relay signal and open the turnstile Emergency Switch to keep the turnstile open in case there are fire or other emergencies Direction Indicator Output to connect a LED screen and indicate whether...

Страница 5: ...3 Memory Function With the memory function the turnstile could remember at most 20 swipes of one card at one time and allows up to 20 visitors to pass so they don t have to swipe card each time this...

Страница 6: ...for more than 6s and then lift the arms manually 5 2 Maintenance Forming maintenance consciousness The tripod turnstile needs to be maintained regularly and repaired once it is damaged It is recommend...

Страница 7: ...s not open after authentication It may be caused by lack of permission or a circuit problem 1 Check whether the user has the permission to open the turnstile 2 Use a multimeter to check whether the NO...

Страница 8: ...cation TCP IP 192 168 1 201 5 Turnstile Opening Duration 5s 6 Passing Direction Indicator Passing is allowed Green Arrow 7 Memory Function Disabled Note The Lock Driving Duration is default 5 seconds...

Страница 9: ...9 Attachment 2 Connection Diagram Overview...

Страница 10: ...10...

Отзывы: