3
3. Equipment Installation
3.1 Installation conditions
The equipment must be installed on concrete ground, ensuring that expansion bolts can be secured firmly.
You are suggested to install an assistant framework or fence to form a passageway, as shown in Figure 3-1.
Figure 3-1
Notes:
1.
When installing the tripod turnstile against the wall, please reserve at least 100 mm space in order to open the cover for
adjustment and maintenance.
2.
The space at the end of the arm shall not be greater than 80 mm (see Figure 3-1).
3.
Setting a warning line for card swiping (see Figure 3-2). A warning line is suggested to prompt users to swipe cards in a
distance, which would greatly reduce the probability of equipment failure caused by improper operations.
Warning line for card swiping
Warning line for card swiping
Warning line for card swiping
Warning line for card swiping
Figure 3-2
3.2 Cabling
There are inlets in the bottom plate for cabling, as shown in Figure 3-3, the unit is millimeter. Power supply and
communication wire should go through the inlet. Cable protection covers are suggested to use if it is surface mounted.
Warning
: The tripod turnstile must be connected to the ground (earth), there is wiring interface near the power switch.
Figure 3-3