3.3 Installation
1.
2. Before installing the device, please make sure that after the safety island is built, open the
door of the device with the key and access the four lines connecting the device. There are
1 AC220V power cord, 1 UTP, 1 RVVP2*0.5 and 1 ground sensor coil lead respectively.
Place the device vertically on the concrete floor or on the safety island. According to the
customer's requirements and referring to the site conditions, place the device on the
installation location (3.5 meters from the device to the barrier gate, the nearest one is not
less than 2.5 meters).
3.5m
TBM01
Barrier gate
8
PC
Ground Sensing
Detector
Ground sensor
coil leads
UTP
Power
RVVP2*0.5
The installation of the TBM01 and TBM02 is roughly the same. The following is an example of
the installation of an TBM01.