Use screw pad to mark the installation position of the cabinet. 

 

Drive four expansion bolts into the bolt holes, as shown in Figure 2-1. 

 

Install screw pads and use a wrench to tighten nuts, as shown in Figure 2-2. 

 

 

Figure 2-1 

 

 

Figure 2-2 

 

 

Screw pad

Ground

Ground

Base 

concrete

Chassis

Expansion bolt

Cabinet

 

Содержание PB4060

Страница 1: ...Contents I Installation Guide PB4060 Version 1 0 Date July 2018 ...

Страница 2: ...Contents Chapter 1 Cable Embedding 1 Chapter 2 Cabinet Installation 2 Chapter 3 Boom Installation 3 Chapter 4 Cabinet Inside 4 Chapter 5 Troubleshooting 6 ...

Страница 3: ...h protective sleeves Use a tool to open a cable tray on the ground see Figure 1 1 Figure 1 1 Cable embedding The power wire is wrapped and protected using the wire sleeve when laid out under the ground the strong current should be separated from the weak current Control room Screw pad Ground Ground Cabinet Expansion bolt 4 M12 Base concrete ...

Страница 4: ...rk the installation position of the cabinet Drive four expansion bolts into the bolt holes as shown in Figure 2 1 Install screw pads and use a wrench to tighten nuts as shown in Figure 2 2 Figure 2 1 Figure 2 2 Screw pad Ground Ground Base concrete Chassis Expansion bolt Cabinet ...

Страница 5: ... Pull the vice boom out from the main boom then fastened by 2 screws as shown in Figure3 1 Installing the boom to the chassis as shown in Figure 3 2 Figure 3 1 Connect the main boom with vice together by 2 screws Figure 3 2 Installing the Boom to the cabinet ...

Страница 6: ...ete key Copy press the key and then press any other key of remote controller until the Copy delete indicator light blinking Delete press the key until the Copy delete indicator light blinking then press the Stop of testing key AC power input Connection with 110 220V power according to type of your purchasing ...

Страница 7: ...fted up automatically Motor AC power motor Hall sensor Connect to Limited switch port of control board which limited the close open position Shock absorber A gel is used to absorb the pressure of close open boom Spring Using it to keep balance with boom For example the boom changed short opening plastic nuts to make spring loosen a little Otherwise the boom may can t close totally ...

Страница 8: ...ent of boom close open A Check whether the shock absorber gel was damaged if yes please replace a new one B Check whether the spring was fatigue deformation if yes please adjust or replace it 3 Boom barrier can t open close totally A After changed shorter boom should have adjusted spring to keep balance B The plug of sensor did not connect correctly 4 The distance of remote controller decrease The...

Отзывы: