9
InBio Pro Series Access Control Panels INSTALLATION guIDE
Installation of Panel & Cabinet
Cable Conduit
(Punch hole for cables)
Temper Switch
InBio Pro Panel
heat Dissipation grill
Power Supply
Backup Battery
Mounting holes
State Indicators
Inserting Panel to Rail
Mounting Rail
We recommend drilling the mounting plate screws into solid wood (i.e. stud/beam). If a stud/beam cannot be
found, then use the supplied drywall plastic mollies (anchors).
Step 1
Pass the cable through holes
Step 2
Mount the Metal Cabinet
Step 3
Insert the InBio Pro Panel as it
shown
Figure 11
Figure 12
1
2