background image

BG1000 Series Barrier Gate 

User Manual 

P a g e

 | 13 

 

Copyright©2021 ZKTECO CO., LTD. All rights reserved. 

6

 

Left and Right Directions 

 

 

7

 

Mainboard Wiring Instructions 

1.

 

Please disconnect the power supply before wiring. 

2.

 

To switch the input voltage to 110V, please note that you need to set the DIP 
switch as shown in the below image: 

 

3.

 

Check carefully whether the terminals are tightened and whether the wiring is firm. 

4.

 

The wiring diagram of the control panel is given below:

 

 

Содержание BG1045L-LED

Страница 1: ...read the instructions carefully before operation Follow these instructions to ensure that the product is functioning properly The images shown in this manual are for illustrative purposes only For fur...

Страница 2: ...content s of the manual seems unclear or incomplete please contact ZKTeco before starting the operation and maintenance of the said equipment It is an essential pre requisite for the satisfactory ope...

Страница 3: ...e right to add delete amend or modify the information contained in the manual from time to time in the form of circulars letters notes etc for better operation and safety of the machine unit equipment...

Страница 4: ...ndent research and development of biometric verification procedures and the productization of biometric verification SDK which was initially widely applied in PC security and identity authentication f...

Страница 5: ...able and field names are inside square brackets For example pop up the New User window Multi level menus are separated by forwarding slashes For example File Create Folder Symbols Convention Descripti...

Страница 6: ...TION WITH UHF CONTROLLER 15 7 2 CONNECTION WITH LOOP DETECTOR 15 7 3 CONNECTION WITH VR10 RADAR SENSOR 16 7 4 CONNECTION WITH INFRARED PHOTOCELL DETECTOR 17 7 5 8 FUNCTIONAL PARAMETER SETTINGS 19 MAIN...

Страница 7: ...BG1000 Series Barrier Gate User Manual P a g e 6 Copyright 2021 ZKTECO CO LTD All rights reserved 12 SAFETY PRECAUTIONS 33 13 TRANSPORTATION AND STORAGE 33 14 WARRANTY 33...

Страница 8: ...d Functionalities The operating speed is 1 5s and the speed can be adjusted according to different boom arm lengths Reversible left and right directions The transmission mechanism is simple compact an...

Страница 9: ...BG1000 Series Barrier Gate User Manual P a g e 8 Copyright 2021 ZKTECO CO LTD All rights reserved 3 Appearance and Dimensions...

Страница 10: ...s 2 5s Boom Length 3m 4 5m 6m 4 5m 4 5m Spring Size 4 5mm 5 5mm 6 5mm 5 5mm 5 5mm Boom Type Telescopic straight boom Straight boom with LED Folding boom Chassis Dimensions 350mm 300mm 1020mm Chassis W...

Страница 11: ...e boom but it cannot be increased After the boom has been cut it is important to set the spring balance again to achieve a new balance The bottom of the spring contains two plastic nuts designed to ad...

Страница 12: ...BG1000 Series Barrier Gate User Manual P a g e 11 Copyright 2021 ZKTECO CO LTD All rights reserved Dimensions...

Страница 13: ...is powered on to run the test process be sure to install the barrier boom of the corresponding length for the test If the barrier boom is not installed please adjust and remove the spring under the gu...

Страница 14: ...board Wiring Instructions 1 Please disconnect the power supply before wiring 2 To switch the input voltage to 110V please note that you need to set the DIP switch as shown in the below image 3 Check c...

Страница 15: ...BG1000 Series Barrier Gate User Manual P a g e 14 Copyright 2021 ZKTECO CO LTD All rights reserved BG1000 Wiring Diagram of Mainboard Connection with LPR Camera 7 1...

Страница 16: ...pyright 2021 ZKTECO CO LTD All rights reserved Connection with UHF Controller 7 2 Note The Reader1 and 2 of Inbio260 Controller corresponds to LOCK1 Reader3 and 4 corresponds to LOCK2 Connection with...

Страница 17: ...All rights reserved Coil Circumference Coil Number 3m Based on requirements ensure that the inductance is between 100 H and 200 H 3m to 6m 5 to 6 turns 6m to 10m 4 to 5 turns 10m to 25m 3 turns 25m 2...

Страница 18: ...BG1000 Series Barrier Gate User Manual P a g e 17 Copyright 2021 ZKTECO CO LTD All rights reserved Connection with Infrared Photocell Detector 7 5 Anti smash function...

Страница 19: ...BG1000 Series Barrier Gate User Manual P a g e 18 Copyright 2021 ZKTECO CO LTD All rights reserved Anti smash and Auto close function...

Страница 20: ...opening and closing strokes Mainboard Parameter Settings 8 1 Key Description Menu Menu options Confirm and Enter Enter Confirm and Exit Open Decrease parameter value Close Increase parameter value 8...

Страница 21: ...nsitivity L 4 30 30 30 Motor Strength Adjustment Default L 5 70 70 70 Horizontal Boom Barrier Adjustment L 6 5 5 8 Test Mode Selection 0 Manual 1 Automatic default L 7 0 0 0 Turn on Memory function 0...

Страница 22: ...c boom dropping delay after starting 0 Disabled 1 255 is the time corresponding to the delay in automatic boom dropping L20 0 0 0 Remote Control Pairing and Unpairing 8 3 1 Remote Control Pairing Long...

Страница 23: ...Menu button then press to select the L20 parameter and then press the Menu to set the parameter value after selection At this time the display will be 000 i e in the disabled state Set the delay value...

Страница 24: ...ust them without the guidance of professionals to avoid mechanical damage 1 Adjust the horizontal position of the barrier boom The connecting boom crank will be an overlapping structure and the two ro...

Страница 25: ...ank is in an unfolded shape and the two rotation points of the connecting boom and the output shaft of the reducer are in an unfolded 3 point line This is the vertical position of the barrier boom If...

Страница 26: ...as follows Step 1 With the barrier boom is in a vertical state turn off the power and then remove the spring as shown in the figure Step 2 Use a socket wrench to remove the linkage arm Unscrew the scr...

Страница 27: ...ht 2021 ZKTECO CO LTD All rights reserved Step 4 Loosen the 2 screws on the spindle connecting arm and take out the rocker arm as shown in the figure Step 5 Take out the spindle connecting arm and pla...

Страница 28: ...served Step 6 Remove the 4 screws on the mechanical limited block move the limit block to the right symmetrical position and then tighten the screws Step 7 Connect the linkage arm to the spindle conne...

Страница 29: ...User Manual P a g e 28 Copyright 2021 ZKTECO CO LTD All rights reserved Step 8 Connect and install the spring connecting arm with the spindle connecting arm gasket on the back of the screw must be sa...

Страница 30: ...then connect it to the spring connecting arm and install it as shown in the figure Step 10 After adjusting the vertical and parallel angles of the barrier boom finally tighten the two screws of the s...

Страница 31: ...spring and the greater the tension The lower the spring screw blue box the looser the spring and the lesser the tension Notes 1 When the barrier boom is at 45 it is the best balance 2 The spring wire...

Страница 32: ...2021 ZKTECO CO LTD All rights reserved 10 Product Packing List Material Quantity Chassis Explosion Screw M12X140 4 Keys 2 Barrier Boom 1 Boom Pressure Plate 1 Chassis Pressure Plate 2 Wireless Remote...

Страница 33: ...Tighten the wiring Description The power indicator is on the landing boom indicator is normal and the motor is not running Cause 1 The motor wiring might be wrongly connected or the wiring is loose 2...

Страница 34: ...power immediately If the product works abnormally please contact the dealer in time Please do not try to repair it by yourself If you handle it without authorization the company is not responsible fo...

Страница 35: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2021 ZKTECO CO LTD All Rights Reserved...

Отзывы: