background image

11

11

CHAPTER  

SAFETY AND RESIDUAL RISKS

MANUFACTURER

Zirkonzahn srl, Headquarters Italy – 39030 Gais – BZ, is the manufacturer of the Face Hunter and 
is referred throughout the Operator’s and Maintenance Manual as Zirkonzahn.

GENERAL INFORMATION

This Operator’s and Maintenance Manual is an integral part of the Face Hunter and must be 
kept in a place known to the operator and easily and immediately accessible at all times. Only 
adequately trained personnel must handle the Face Hunter.

This Operator’s and Maintenance Manual covers all you need to know for safe use and 
maintenance of the Face Hunter produced by Zirkonzahn srl. However, it is not intended to replace 
a training course with regard to the scope of application.

6JG(CEG*WPVGTKUCPKORQTVCPVEQORQPGPVQHVJGFKIKVCNYQTMƀQYCPFKVUHWPEVKQPUCTGKFGCNN[

suited for working with the Zirkonzahn CAD/CAM system. The operation of the Face Hunter is 
very intuitive. However, in order to fully exploit its potential, which mainly consists in the further 
use of the generated data in the Zirkonzahn.Software, it is recommended to take part in the CAD/

%#//KNNKPI(CEG*WPVGTKPVTQFWEVQT[EQWTUG;QWECPſPFCNNKPHQTOCVKQPCDQWVVJGEWTTGPV

course programme and a list of Zirkonzahn Education partners in your vicinity on our homepage 
www.zirkonzahn.com or by contacting us directly by telephone under +39 0474 066 650.

Operational capability and long-term value of the Face Hunter can only be guaranteed if service 
and maintenance work prescribed in this Operator’s and Maintenance Manual is carried out. 

This manual is subject to amendments at Zirkonzahn's sole discretion in the event of technical 
further development.

The device complies with the applicable EU directives. The declaration of conformity is available 
and will be sent to the user upon request.

SAFETY AND 
RESIDUAL RISKS

Содержание Face Hunter

Страница 1: ...Face Hunter operator s and maintenance manual...

Страница 2: ...02 02 Operator s and maintenance manual original operating manual Face Hunter Version 22 10 2019 Copyright 2019 Zirkonzahn srl...

Страница 3: ...03 03...

Страница 4: ...ents 14 Safety regulations 14 Safety concept 14 Personal safety equipment 14 Safety measures when cleaning the device 15 Workplace handling references to safety 15 Troubleshooting 15 Restart protectio...

Страница 5: ...ting up 33 Operation 33 Shutting down the device 34 Normal shutdown 34 Emergency shutdown 34 Cleaning and maintenance 35 Safety measures when cleaning the device 35 Dry cleaning 35 Cleaning instructio...

Страница 6: ...06 06...

Страница 7: ...07 07...

Страница 8: ...ir and maintenance work on moving parts is strictly forbidden Prohibition The use of water compressed air or solvents is strictly forbidden Mandatory sign Unplug from mains power This symbol refers to...

Страница 9: ...forks and 10 reference markers Transfer Fork Reference Cover Mains plug Lan cable Dongle Face Hunter 75 CUJ FTKXG CVVGTKGU HQT CUJNKIJV Operator s and maintenance manual Instructions for Face Hunter s...

Страница 10: ...10 10...

Страница 11: ...N suited for working with the Zirkonzahn CAD CAM system The operation of the Face Hunter is very intuitive However in order to fully exploit its potential which mainly consists in the further use of t...

Страница 12: ...s carried out on the Face Hunter The manufacturer does not accept any responsibility for applications not described here which do not fall within the FG PKVKQP QH KPVGPFGF WUG 6JG OCPWHCEVWTGT FGENKPG...

Страница 13: ...rkonzahn grants a warranty of 12 months for the equipment If the Face Hunter is passed on to third parties the warranty obligation is recognised only if the passing on occurs within the set warranty p...

Страница 14: ...improvements Zirkonzahn is not obliged to carry out technical amendments to equipment produced at earlier stages SAFETY REGULATIONS Read and follow the safety instructions in this operator s manual t...

Страница 15: ...VJG 1RGTCVQT U Manual the Face Hunter must be turned off Prevent unauthorised operation For troubleshooting please contact our Zirkonzahn Support Tel 39 0474 066 630 support zirkonzahn com Restart pr...

Страница 16: ...plosive atmospheres and to clean the Face Hunter with solvents TRANSPORT UNPACKING AND SETTING UP OF THE DEVICE The Face Hunter has to be moved and put down on surfaces with suitable stability in a dr...

Страница 17: ...t and possible import fees Check the delivery for completeness and integrity immediately after receipt Evident defects must be noted on the delivery documents in order to claim for compensation agains...

Страница 18: ...18 18 CHAPTER SAFETY AND RESIDUAL RISKS...

Страница 19: ...19 19 CHAPTER 2 COMPONENTS COMPONENTS...

Страница 20: ...1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x Optional 20 20 CHAPTER 2 COMPONENTS FACE HUNTER...

Страница 21: ...er 0 3 seconds Glass front plate cladding Hardened Securit Glass UNI ISO 12150 Operating voltage 110 240 V Power input 1 3 A 240 V 2 6 A 120 V Output Power 80 W Frequency 50 60 Hz Mains fuse External...

Страница 22: ...light projector and by taking pictures with two cameras The mechanical optical and electronic components are protected against damage in the stable casing consisting of special glass and sheet metal T...

Страница 23: ...laim for compensation against the transport company In case of complaints have the transport documents countersigned by the carrier and send a copy to Zirkonzahn Transport weights Face Hunter 5 6 kg T...

Страница 24: ...in case of emergency 2TQXKFG RQYGT UWRRN 8 CU C ZGF EQPPGEVKQP CPF NC EQPPGEVKQP ECDNG RTQVGEVGF ensuring strain relief The electrical socket and mains fuse must be set up according to the valid natio...

Страница 25: ...ptimal scan results The white balance should be made at a distance of at least one meter from a gray or black object IMPORTANT FCTM DCEMITQWPF 6JG CUJGU OWUV DG CKOGF FKTGEVN CV VJG QDLGEV TKIJV DCEMI...

Страница 26: ...4 3 6 5 2 1 26 26 CHAPTER 4 INSTALLATION FIRST START UP...

Страница 27: ...27 27 CHAPTER 4 INSTALLATION FIRST START UP Backside Face Hunter QPPGEVKPI VJG CUJ U UVGO QPPGEVKQP HQT CUJNKIJVU...

Страница 28: ...28 28 CHAPTER 4 INSTALLATION FIRST START UP Backside Face Hunter On Off Mains plug...

Страница 29: ...LLATION FIRST START UP Connection to PC Backside PC Backside Face Hunter Plug in the Face Hunter dongle if another dongle is already plugged in replace it with the Face Hunter dongle LAN connection IP...

Страница 30: ...30 30 CHAPTER 4 INSTALLATION FIRST START UP Focal length Exposure time Pull out the diffu UGT CPF TG GEVKQP plate and fold downwards TQPV UKFG CUJ...

Страница 31: ...2 1 4 3 5 31 31 CHAPTER 4 INSTALLATION FIRST START UP...

Страница 32: ...N FIRST START UP Laptop connections LAN connection IP address 172 17 23 12 Plug in the Face Hunter dongle if another dongle is already plugged in replace it with the Face Hunter dongle Backside Face H...

Страница 33: ...G FGXKEG KU VWTPGF QP D QRGTCVKPI VJG OCKP UYKVEJ QP VJG DCEMUKFG NUQ VWTP QP VJG CUJNKIJVU and align them Never position the patient closer than 1 m in front of the Face Hunter Adjust the tripod heig...

Страница 34: ...ode 08 Position the patient at least one meter in front of the Face Hunter and check in the live image in the software whether the whole face is visible 09 Now all required images can be taken For ste...

Страница 35: ...UGTXKEG EGPVGTU URGEK GF KP QWT maintenance contract DRY CLEANING IMPORTANT The use of compressed air water or solvents is prohibited Clean with a dry cloth only Do not wet clean or use solvents Only...

Страница 36: ...efects are detected the Face Hunter may not be used The device must be shut down and secured against unauthorised access For trouble shooting please contact our Zirkonzahn Support Tel 39 0474 066 630...

Страница 37: ...VGPCPEG EQPVTCEV 4GRCKTU CPF VTQWDNG UJQQVKPI UJQWNF DG FQPG QPN under their guidance or in accordance with the Operator s and Maintenance Manual Zirkonzahn Support Tel 39 0474 066 630 support zirkonz...

Страница 38: ...KU FGVGEVGF EQPUWNV KTMQP CJP QT VJG UGTXKEG EGPVGTU URGEK GF KP QWT OCKPVGPCPEG contract in order to discuss further steps in detail If return shipment is required always use the original packaging...

Страница 39: ...39 39 CHAPTER 7 REPAIRS AND TROUBLESHOOTING...

Страница 40: ...HUMAN ZIRCONIUM TECHNOLOGY Zirkonzahn Worldwide Tel 39 0474 066 660 info zirkonzahn com www zirkonzahn com All information is subject to change Errors and omissions excepted Version 22 10 2019...

Отзывы: