WWW.
ZIPPITY
-OUTDOOR.COM
5
ASSEMBLY
INSTRUCTIONS
ZP19038
STEP 1:
LAY OUT
MATERIALS
A
B
D
F
C
E
G
H
I
J
K
L
Post Cap
(6)
Post
(4)
⅞
” x 1½” x 44”
Gate Post
(2)
⅞
” x 1½” x 34”
Picket
(8)
¼
” x 1¼” x 31¼”
Gate Rail
(2)
1½” x 1½” x 36”
Rail
(4)
1½” x 1½” x 7⅜”
Gate Hinge
(2)
Gate Latch
(1)
¾” White
Self-Drilling
Stainless Steel
Screw
(40)
L Bracket
(4)
⅟₁₆” Drill Bit
(1)
1/8” Black Self-
Drilling Stainless
Steel Screw
(14)