Zip Tudor T4UB5 Скачать руководство пользователя страница 13

13

Installation instructions & user manual

 

T210008 v3.00 May 2019 - Tudor

Technical support 

 

Tel: 0345 6 005 005 email: [email protected]  www.zipwater.co.uk

Installation

• 

The inlet control valve supplied 
incorporates compression fittings 
suitable for fitting between 15mm 
copper piping (water supply) and 
the inlet connection (coloured 
blue) situated on the water heater.

• 

Fit the control valve to the cold 
water supply ensuring that the 
water will flow in the direction of 
the arrow indicated on the side of 
the control valve (Fig.2).

• 

Do not over tighten the 
compression joints but ensure that 
they are leak free.

WATER

SUPPLY

Fig. 2

• 

Connect the hose from (A) on the tap body 
to the mains cold water supply.

• 

Connect the hose from (B) on the tap body 
to the cold water supply to the heater.

• 

Connect the hose from (C) on the tap body 
to the hot water output on the heater.

• 

Fill the heater tank before turning the 
power on. 

• 

Turn on the water supply and check for 
leaks.

• 

Open both hot & cold taps until water freely 
flows from the tap spout.

• 

Turn on the heater and allow it to heat up.

Note 

When installing under-basin models it is 
recommended that fibre washers are used on both inlet and outlet connections to 
ensure a watertight seal.

Fig.3

Over-basin Installation

Under-basin Installation

Cold isolation valve

(not supplied)

A

B

C

Mains in

Cold input

Hot output

Содержание Tudor T4UB5

Страница 1: ...manual T210008 v3 00 May 2019 Tudor Technical support Tel 0345 6 005 005 email service zipindustries co uk www zipwater co uk Zip Tudor Installation instructions user manual Modelnumber T4UB5 T4OB5T4O...

Страница 2: ...stallation 12 Requirements 12 Wall mounting 12 Over basin installation 13 Under basin installation 13 Electrical installation 14 Cable installation replacement 14 Safety cut out 14 Commissioning opera...

Страница 3: ...ntact separation of at least 3mm in all poles and be protected by a suitably rated RCD To protect the appliance an MCB miniature circuit breaker or cartridge fuse must be fitted with a rating suitable...

Страница 4: ...supply immediately In case of leaks also isolate the water supply Repairs must only be carried out by a competent person Temperatures in excess of approximately 43 C are perceived as hot especially by...

Страница 5: ...st be completely filled with water before the electrical supply is switched on THE HOT WATER SHOULD BE DELIVERED FROM THE OPEN OUTLET SPOUT SUPPLIED OR A ZIP APPROVED OPEN OUTLET TAP FITTING THAT REMA...

Страница 6: ...nd these will cease when the cycle has been completed and the stored water temperature has reached the level set by the user The higher the temperature selected the greater the rate of expansion Over...

Страница 7: ...vals The Zip Tudor models are approved to the LVD EMC directives and are CE endorsed The Zip Tudor models have been examined tested and found when correctly fitted to comply with the requirements of t...

Страница 8: ...tat temperature setting e 2 Specific precautions See installation and operating instructions Smart value 0 Rated volume l 5 5 5 7 9 8 9 9 Weight empty full kg 3 5 8 5 4 0 14 0 Power rating W 2 000 Nom...

Страница 9: ...n a T4UB10 310 265 471 100 70 n a 196 T4OB5 255 215 390 100 70 264 n a T4UB5 255 215 390 100 70 n a 138 Dimension table All dimensions in mm Note Over basin and under basin models are NOT interchangea...

Страница 10: ...45 6 005 005 email service zipindustries co uk www zipwater co uk Spare parts Item Description Part no 1 Heating element 5 10L 2kW 95110 2 Element O ring CT0116 3 3 Re settable cut out for Tudor CT012...

Страница 11: ...ve 1 Outlet spout 1 except UB models Please check that the items listed below have been supplied in the product pack Only Zip approved open outlet accessories should be used the following are availabl...

Страница 12: ...r installation For maintenance work an isolating valve should be installed in the water supply line to the heater A minimum clearance of 270mm is required underneath the over basin heater units and ab...

Страница 13: ...nts but ensure that they are leak free WATER SUPPLY Fig 2 Connect the hose from A on the tap body to the mains cold water supply Connect the hose from B on the tap body to the cold water supply to the...

Страница 14: ...to the following Cable installation replacement instructions below Cable installation replacement First remove the temperature adjustment selector switch and release the screw located beneath Unscrew...

Страница 15: ...ing temperature has been reached approx 10 mins for the 5L models approx 20 mins for the 10 litre models Therefore always ensure that the spout outlet is positioned over the basin Hot water is drawn o...

Страница 16: ...and cleaned at regular intervals The electrical and plumbing components should be inspected at least every 3 years by a competent person familiar with point of use water heaters to ensure proper funct...

Страница 17: ...Possible cause Solution No water Mains water not turned on Check supply and turn on No hot water Over temperature cut out has operated Refer to instructions on page 14 Faulty thermostat Replacethermos...

Страница 18: ...out wheeled bin logo indicates that this product needs to be disposed of separately to any other household waste Within each of the European Union member countries provisions have been made for the co...

Страница 19: ...isuse abuse unsuitable water conditions including contaminants or inappropriate water pressure or to any alteration modification or repair by any party not expressly nominated by Zip 2 This warranty d...

Страница 20: ...manual T210008 v3 00 May 2019 Tudor Technical support Tel 0345 6 005 005 email service zipindustries co uk www zipwater co uk ZipWaterUK 14BertieWardWay Dereham Norfolk NR191TE 03456005005sales zipin...

Отзывы: