background image

Page 7 of 12 

 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01

Installation Procedures 

Continued

Step 3 – Connecting
a) Plumbing

For exposed plumbing connection, connect the cold water inlet pipe from the 
base of the heater directly to the 15mm (1/2”) compression fittings with the nuts 
and olives provided.
For concealed plumbing connections, connect the cold water pipe through the 
rear of the chassis using a 15mm (1/2”) capillary elbow.
Cold water pipes must be flushed before connection to the inlet. Any clogging 
due to sediment or fines will adversely affect the operation of the heater.
The heater must be installed with an isolating valve which allows it to be isolated 
from the mains supply for servicing.

Water pressure requirements:

Minimum - 0.07 MPa (0.7 bar) Maximum - 0.7 MPa (7 bar).
Caution: If pressure is likely to exceed 0.7 MPa (7 bar), a pressure limiting valve 
must be installed in the cold water supply line. Zip recommends a valve rated at 
3.5 bar (0.35 MPa) for this application (Zip part No. AQ3).

b) Venting

A vent at the base of the heater must be plumbed to a safe visible location as, 
under certain conditions, it may discharge cold or boiling water and / or steam.
For exposed vent plumbing, connect vent outlet from the base of heater to a  
15mm or half inch OD pipe which has a continuous fall, is no more than 3 
metres long, has no more than 3 right angle bends, and discharges to a waste 
water drain.
For concealed vent plumbing (Fig. a), connect plumbing to the vent outlet from 
the heater rear using a capillary elbow protruding 45mm from the wall. The 
plumbing must then be directed to a tundish that must be in a visible location 
before being plumbed away to waste.
Alternatively attach the tundish to the wall (Fig. b) and plumb away to waste.

c) Electrical

For concealed electrical connection, run the power cable through the rear 
access opening of the heater to the terminal block within the heater.
For surface mount installation run the power cable through the cable entry 
gland at the bottom of the unit to the terminal block within the heater. Ensure 
the cable is firmly secured.
Isolation switches must have a contact separation of at least 3mm in all poles.

Do not turn the power ON

 until water flows from the tap.

250mm

Wiring

Fig. a

Concealed 

Vent

Concealed 

Inlet

45 mm

Fig. b

Visible Tundish

Vent line

Surface mount 
cable entry

Terminal Block

Concealed 
cable entry

Approximate Weights When 

Filled

1.5 Litre models

10 kg

3.0 Litre models

12.5 kg

5.0 Litre models

16.5 kg

7.5 Litre models

20.5 kg

Содержание Hydroboil HS001

Страница 1: ...structions Zip Hydroboil Instant boiling water HS001 Zip Hydroboil 1 5 Litre White HS003 Zip Hydroboil 3 0 Litre White 03552 HS005 Zip Hydroboil 5 0 Litre White 05552 HS105 Zip Hydroboil 5 0 Litre Sta...

Страница 2: ...plumbing fittings have been tightened 3 Ensure the vent pipe is positioned to drain correctly 4 Check all electrical connections are correct and there are no loose wires Commission 7 Flush the supply...

Страница 3: ...2 NOTE Read all instructions and precautions before proceeding If in doubt or need further guidance please call Zip on 0845 6 005 005 Please leave these instructions with the end user after installati...

Страница 4: ...s per hour Rating kW 230V Width mm Depth mm Height mm Weight Empty Kg Weight Filled Kg HS001 White 1 5 9 100 1 5 289 180 335 7 0 10 0 HS003 White 3 0 18 100 1 5 289 180 431 8 0 12 5 HS005 White 5 0 30...

Страница 5: ...these Installation Instructions This appliance must be earthed If the power cable is damaged it must be repaired only by a qualified technician To avoid hazards all installation procedures must be car...

Страница 6: ...trate If not supply your own suitable fixings Ensure the mounting surface is capable of supporting the weight of the filled unit fixings must be capable of supporting the heater weight when filled See...

Страница 7: ...oiling water and or steam For exposed vent plumbing connect vent outlet from the base of heater to a 15mm or half inch OD pipe which has a continuous fall is no more than 3 metres long has no more tha...

Страница 8: ...turn on the power at this stage Ensure the tap handle is correctly adjusted to its optimum position Screw the red knurled cap clockwise until hand tight without using excessive force or a tool of any...

Страница 9: ...ccuracy Class 5 or better Class 5 denotes an accuracy of 5 full scale deflection 1 Isolate power supply 2 Set meter to 0 ohm with leads connected together 3 Connect one test lead to the earth pin on t...

Страница 10: ...ll valve assembly Airlock in transfer tube Water not boiling No power Check power supply Faulty thermostat element or cutout Contact Zip authorised agent Runs out of boiling water and fails to refill...

Страница 11: ...load kit other HS models 14 SP90501 Tap top kit 15 SP90502 Tap assembly complete 16 SP90503 Strap key kit 1 5 3 litres Key Part No Description 16 SP90504 Strap key kit 5 7 5 litres 17 SP90505 Tap nut...

Страница 12: ...o water quality and the rate of water consumption Zip does not exclude restrict or modify any liability that cannot be excluded restricted or modified or which cannot except to a limited extent be exc...

Отзывы: