Zip Command-Centre Скачать руководство пользователя страница 16

Page 16 of 20 

   804052UK - Residential chilled and sparkling installation instructions - Sept 2016 - v3.02

The HydroTap

®

G4 is now ready to be commissioned. 

• 

Turn on the power, gas and water and check for any leaks.

• 

Familiarise yourself with the operation of the HydroTap

®

G4 in preparation for use (see user manual).

• 

Follow the installation instructions below (and review section C of the user manual). 

• 

After commissioning, the system may be customised by selecting further options in section G - 

Settings, of the user manual.

Section 4

Commissioning

Commissioning

• 

Press the [MENU] button for main menu.

• 

Press the [Install] button. 

• 

Press the [Purge CO] button. 

• 

In the next screen, press the [START] 

button to commence the purging process. 

• 

You will hear the CO

2

 gas running through 

the tap.

• 

Run for 10 seconds to fully purge the CO

2

.

• 

Press the [STOP] button to stop the purge.

• 

Press [Next] for filter flush screen.

 4.2 - CO

2

 purge

4.1 - Select the language 

Initial commissioning screen

Language selection screen

Zip BC Sparkling

Zip BC Sparkling

Содержание Command-Centre

Страница 1: ...02 Page 1 of 20 Zip HydroTap G4 Installation instructions Chilled sparkling model Command CentreTM Filtered chilled and sparkling drinking water for residential kitchens Affix model number label here...

Страница 2: ...taps to suit the customer s needs Classic HydroTap G4 range Arc Cube HydroTap G4 range Elite HydroTap G4 range These standalone taps are directly compatible with the G4 Command CentreTM Celsius HydroT...

Страница 3: ...ead Step 2 Check for adequate ventilation Section 1 Ventilation 1 1 Ventilation on all models 11 Step 3 Fit the CO2 gas cylinder Section 2 CO2 cylinder and regulator 2 1 2 4 Connect secure and test th...

Страница 4: ...er cupboard floor has sufficient strength to support the Command CentreTM when full of water see page 9 for weights Before commissioning Check the Command CentreTM has been installed correctly Check a...

Страница 5: ...r residential applications The Zip HydroTap G4 Command CentreTM utilises a conventional refrigerant compressor to chill the water and uses a CO2 gas cylinder to carbonate the chilled water The Command...

Страница 6: ...n To avoid hazards all installation procedures must be carried out by a suitably qualified tradesperson The power cable and power outlet must be in a safe visible position for connection Lifting Take...

Страница 7: ...nd CentreTM is rated for 230V 50Hz AC operation Do not remove the cover of the appliance under any circumstances without first isolating the appliance from the power supply The Zip HydroTap G4 Command...

Страница 8: ...o that the connection point and the stop cock will not be obstructed when all the undersink units are installed For Zip HydroTap 160 125 160 175 models a 220 240Vac 10A GPO will be required For Zip Hy...

Страница 9: ...sparkling models 1x13A 0 35 280 x 405 x 333 30kg Min Max water supply pressure HydroTaps and Mains All in One taps 0 25 MPa 2 5 bar 0 7 MPa 7 bar Chilled and sparkling HydroTap G4 range Chilled spark...

Страница 10: ...40V AC 13A socket will be required The Command CentreTM must be installed in accordance with IEE regulations See Technical specification page 9 for power ratings Note Check all cable and hose lengths...

Страница 11: ...the cupboard position A2 Where possible air inlet vent and the air outlet vent should be positioned at opposite ends of the same cupboard space 1 1 Ventilation for all models The clearance envelope di...

Страница 12: ...upright position 2 2 Connect the regulator Remove the gas cylinder from the strap Make sure the regulator knob is turned fully clockwise to the end stop before fitting Screw the regulator clockwise o...

Страница 13: ...eak test to check for gas leaks between regulator and cylinder and between regulator and braided hose Stage 1 1 Turn the gas off 2 Using soapy water applied with a sponge or with a brush cover all of...

Страница 14: ...mand CentreTM The blue chilled and white sparkling pipes must be insulated with the sleeving provided CHILLED OUT Note Mains hose length is 750mm Electrical power cable length is 3 0m nom Position the...

Страница 15: ...lope Note Mains hose length is 750mm Electrical power cable length is 3 0m nom Position the Command CentreTM according to the hose and cable lengths supplied 3 3 Chilled sparkling and mixed hot cold C...

Страница 16: ...oning the system may be customised by selecting further options in section G Settings of the user manual Section 4 Commissioning Commissioning Press the MENU button for main menu Press the Install but...

Страница 17: ...ter Flush Menu Stop cock operation Have a bucket or similar container not supplied at the ready to hold a quantity of water that will be ejected while the filter flush mode is in operation Open the fi...

Страница 18: ...ocked Blocked air filter Remove blockage clean filter check user guide Water leak Isolate Mains Water leak Turn off mains water supply call for service Compressor Over Run Compressor too hot Check ven...

Страница 19: ...n of the appliance the use of non authorised parts or consequential damage to any other goods furnishings or property No warranty applies to the life of any filtration cartridge installed with the app...

Страница 20: ...rks of Zip Heaters Aust Pty Ltd Zip products described in this publication are manufactured under one or more of the following patents AU675601 AU637412 AU635979 GB0422305 GB2065848 US4354049 US510385...

Отзывы: