background image

Page 7 of 16 

Zip Hydroboil Plus - Installation & Operating Instructions - 89956UK - January 2012 v1.04

Visible Tundish

Vent line

bends, and discharges to a waste water drain.

For concealed vent plumbing, direct the vent outlet from the heater rear, using a visible 
tundish. (see diag at left)

c) Electrical

For concealed electrical connection, connect a power cable through the rear access opening 
of the heater to the terminal block within the heater as shown.

Do not turn the power ON until the heater is filled to the tap level, with water.

Step 4 – Assembling

Place the heater case back on to the heater and secure the top 2 case screws. Secure two 
bottom case screws. 

Insert Outlet Nozzle into the heater case.

Ensure the outlet tube is correctly positioned within the outlet nozzle.

Step 5 - Commissioning 

Check previous steps. Turn water supply ON. Water is now flowing into heater, check 
connections for leaks. Wait approximately 5 minutes and check outlet tap for water. This is 
achieved by pressing the tap paddle. 

Power is only to be turned on when water is available from this outlet.

Turn power ON. After a short period, boiling water will be available and will be maintained 
close to boiling point thereafter. Initial heating periods are shown in the table on the left.  

Warning: this appliance must be earthed. 

Following remedial service the earthing continuity of the heater must be checked by 
a qualified technician using an appliance tester, or continuity tester of accuracy Class 
5 or better. Class 5 denotes an accuracy of 5% full scale deflection.

1. Isolate power supply.

2. Set meter to 0 ohm with leads connected together.

3. Connect one test lead to the earth wire on the product.

4. Connect the other test lead to a bare patch of metal (preferably on the edge) of the 
top of the cover, then to the front cover of the unit. 

Warning-

 the water may be boiling - show extra care.

5. Test that in every instance the electrical resistance does not exceed 1 ohm.

Earthing Continuity Verification

If required, an earth continuity test can be 
performed by testing between the earth wire 
on the product’s lead and a exposed piece of 
metal on the case and the tap body.

Installation Procedures 

(continued)

 

Inlet water 
temperature

15°C

10°C

10 Litre models

38 min

40 min

15 Litre models

40 min

43 min

25 Litre models

47 min

50 min

40 Litre models

60 min

64 min

Содержание 89956UK

Страница 1: ...droboil Plus Installation Operating Instructions 89956UK January 2012 v1 04 Page 1 of 16 Installation and Operating Instructions Zip Hydroboil Plus Large boiling water Affix Model Number Label Here 89...

Страница 2: ...Page 2 of 16 Zip Hydroboil Plus Installation Operating Instructions 89956UK January 2012 v1 04 This page intentionally left blank...

Страница 3: ...Read these warnings first 4 Installation Requirements 4 5 Installation Procedures 5 7 Step 1 Positioning 5 Step 2 Fastening 5 See page 6 Wall Mounting Template Dimensions Step 3 Connecting 6 a Plumbi...

Страница 4: ...g the heater from the power supply Do not use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall...

Страница 5: ...tap to be not less than 200 mm above the draining board height should be increased only if essential for filling larger vessels Provide clearance for service access of not less than 150 mm top 65 mm l...

Страница 6: ...dversely affect the operation of the heater The heater must be installed with an isolating valve which allows it to be isolated from the mains supply for servicing Water pressure requirements Minimum...

Страница 7: ...outlet Turn power ON After a short period boiling water will be available and will be maintained close to boiling point thereafter Initial heating periods are shown in the table on the left Warning t...

Страница 8: ...panel until it latches in the closed position and the unlocked indicator is illuminated Warning The unit is now capable of dispensing boiling water without the safety feature Dispensing Boiling water...

Страница 9: ...n have 2 ON OFF times per day If the user selects either of the energy saver modes see below ON OFF mode cannot be used The user is not able to access this part of the configuration The real time cloc...

Страница 10: ...the ambient light in the room where the Hydroboil Plus is installed drops below 100lux the unit goes into energy saver mode and will allow the temperature of the stored water to drop to and be mainta...

Страница 11: ...2 To increment the Minutes press CSS3 To step to the next configuration parameter press CSS1 SET DAY OF THE WEEK To return to Normal Mode press CSS4 To step to the next day of the week press either CS...

Страница 12: ...Light sensor is configured as on pressing CSS1 will return the user to Normal Operation Note 3 If both Sleep Mode and Low Light sensor is configured as off the user will be able to use ON OFF mode SUN...

Страница 13: ...rrectly Please contact your local city council for collection centre details Problem Solving Sympton Possible Cause Solution Fails to dispense water Water isolating valve turned off Blocked filter blo...

Страница 14: ...9 90102UK Cistern Float S Nut Kit 10 90495UK Banjo Screw Kit 11 90174UK Contactor Kit 12 90743UK Fascia Lens 13 90994UK Fascia Assy Electronic White 13 90995UK Fascia Assy Electronic Grey 14 90620UK...

Страница 15: ...Page 15 of 16 Zip Hydroboil Plus Installation Operating Instructions 89956UK January 2012 v1 04 Spare Parts 7 RQQHFWRU 6 RQQHFWRU 21 IRU Contactor Only for 40L...

Страница 16: ...tration cartridge installed with the appliance as cartridge life may vary according to water quality and the rate of water consumption Zip does not exclude restrict or modify any liability that cannot...

Отзывы: