This page is the introduction to the Battery self-test setting (Fig. 4-20)
UPS has no need forbattery self-
-test automatically per
30 days. Three kinds of Battery Self-test Time can be chose as below.
Fig. 4-21 Autotest time On1
When choosing On1, UPS can transfer to Battery Mode automatically per 30 days. And the Battery Self-test Time
is 10 seconds (Fig. 4-21).
Fig. 4-22 Autotest time On2
When choosing On2, UPS can transfer to Battery Mode automatically per 30 days. And the Battery Self-test Time
is 10 minutes (Fig. 4-22).
Fig. 4-23 Autotest time On3
When choosing On3, UPS can transfer to Battery Mode automatically per 30 days. And the Battery Self-test Time
is to End Of Discharge (EOD) (Fig. 4-23).
Parallel ID setting (PId)
Fig. 4-24 Parallel ID setting