6 Commissioning
6.1
Operating conditions
"
"
The elevator machine may only be installed in a machine room that is not freely accessible.
"
"
Be aware of the protection class speci
fi
ed on the name plate.
"
"
Do not operate the elevator machine in an explosive atmosphere.
"
"
For all usage conditions that di
ff
er from the order, please contact ZIEHL-ABEGG SE.
6.2
Commissioning
6.2.1
First Start-up
Before
fi
rst-time start-up, check the following:
"
"
Installation and electrical connection have been properly completed.
"
"
Safety devices are installed.
"
"
All leftover installation materials and other foreign materials have been removed.
"
"
The protective earth is connected.
"
"
Temperature monitoring is evaluated.
"
"
Cable entries closed.
"
"
Mounting, installation position and accessories are o.k.
"
"
Connection data corresponds to the data on the name plate.
6.2.2
Prerequisites for start-up
•
The elevator machine may not be operated without an axle load or without cables, as the bearing
could otherwise be damaged!
•
Only o
ff
set adjustment is allowed with no axle load.
6.3
Tests
Tests on elevator systems can be performed by the assembly company or a certi
fi
cation authority or
organisation. This involves discovering of failure-critical and hazardous conditions. The relevant
operator is responsible for safety. The descriptions below are intended as recommendations for the
technical procedure and do not deal in su
ffi
cient depth with safety engineering aspects of the relevant
system. Therefore, priority is given to the safety engineering speci
fi
cations of the assembly company
or operator. Only trained specialist personnel may carry out tests.
6.3.1
Half load test with current measurement
The test for the 50 % weight compensation should preferably be carried out as follows:
"
"
The motor current is to be measured in both travel directions with a half load.
"
"
The measured currents should correspond as closely as possible.
"
"
The di
ff
erence between the measured currents should not show a variation of more than 10 %.
Half load test with release of the brake only
"
"
The short-circuit of the motor windings, if installed, should be disabled for the duration of the half
load test.
"
"
With a half load and the brake released, the car may not move.
"
"
After the half load test, the shorting circuit is to be reactivated.