ZIEHL-ABEGG Z-G-1NE Скачать руководство пользователя страница 6

2.4 Requirements placed on the personnel / due diligence

Persons entrusted with the planning, installation, commissioning and maintenance and 
servicing in connection with the frequency inverter must have the corresponding qual-
i

cations and skills for these jobs.

In addition, they must be knowledgeable about the safety regulations, EU/EC directives, 
rules for the prevention of accidents and the corresponding national as well as regional 
and in-house regulations. Personnel to be trained or instructed and apprentices are only 
permitted to work on the device under the supervision of an experienced person. This 
also applies to personnel undergoing general training. Comply with the legal minimum 
age. 

2.5 Start-up and during operation

Attention!

During commissioning, unexpected and hazardous conditions can arise in the entire 
installation due to defective adjustments, defective components or incorrect electrical 
connections. Remove all persons and objects from the hazardous area.

During operation, the device must be closed or installed in a control cabinet. Fuses 
may only be replaced by new ones and must not be repaired or bypassed. The data 
for the maximum line fuse are to be considered absolutely (see Technical data). Use 
only fuses speci

ed in schematic diagrams.

Any faults detected in the electric system/modules/operating equipment must be 
corrected immediately. If these faults are not corrected, the device/system is 
potentially very dangerous. The device/system must therefore not be operated when it 
is faulty.

Pay attention to smooth, low vibration running of the motor/fan, the appropriate 
instructions in the drive documentation must be observed!

2.6 Work on the device

Information

Mounting, electrical connection, and start-up operation may only be carried out by an 
electrical specialist in accordance with electrotechnical regulations (e.g. EN 50110 or 
EN 60204)!

Danger due to electric current

It is generally forbidden to carry out work on electrical live parts. Protection class of the 
device when open is IP00! It is possible to touch hazardous voltages directly.
The safe isolation from the supply must be checked using a 

two-pole

 voltage detector. 

Operating Instructions 

NETcon

 Z-G-1NE

Safety instructions

L-BAL-E244-GB 1732 Index 003

Part.-No. 

6/17

Содержание Z-G-1NE

Страница 1: ...NETcon Z G 1NE Part No 380097 380105 MODBUS REPEATER Operating Instructions L BAL E244 GB 1732 Index 003 Part No english ...

Страница 2: ...terventions in the device 7 2 8 Operator s obligation of diligence 7 2 9 Employment of external personnel 7 3 Product overview 8 3 1 Operational area 8 3 2 Function 8 3 3 Maintenance 8 3 4 Transport 8 3 5 Storage 8 3 6 Disposal recycling 8 4 Mounting 9 4 1 General notes 9 4 2 Temperature influences during commissioning 9 5 Electrical installation 9 5 1 Safety precautions 9 5 2 Voltage supply 10 5 3...

Страница 3: ...ion 13 7 Enclosure 14 7 1 Technical data 14 7 2 Connection diagram 15 7 3 Dimensions mm 16 7 4 Manufacturer reference 17 7 5 Service information 17 Operating Instructions NETcon Z G 1NE L BAL E244 GB 1732 Index 003 Part No 3 17 ...

Страница 4: ...ns and skills for their job 1 3 Exclusion of liability Concurrence between the contents of these operating instructions and the described hardware and software in the device has been examined It is still possible that non compliances exist no guarantee is assumed for complete conformity To allow for future developments construction methods and technical data given are subject to alteration We do n...

Страница 5: ...ersonal harm or material damage arising from non intended use 2 2 Explanations of symbols Safety instructions are highlighted with warning triangles and are depicted according to the degree of hazard as follows Attention General hazardous area Death or severe injury or significant property damage can occur if the corresponding precautions are not taken Danger due to electric current Danger by dange...

Страница 6: ...stalled in a control cabinet Fuses may only be replaced by new ones and must not be repaired or bypassed The data for the maximum line fuse are to be considered absolutely see Technical data Use only fuses specified in schematic diagrams Any faults detected in the electric system modules operating equipment must be corrected immediately If these faults are not corrected the device system is potenti...

Страница 7: ... Application You must periodically examine the safety equipment for their properly functioning condition The assembly instructions and or operating instructions are always readily available at the location where the device is being used are complete and are in legible condition These persons are regularly instructed in all applicable questions regarding occupa tional safety and environmental prote...

Страница 8: ...tervals 3 4 Transport The device is packed ex factory to suit the transport method previously agreed Always use the original packaging materials when transporting the device Avoid shocks and impacts to the device during the transport During manual handling the human lifting and carrying restrictions must be observed and adhered to 3 5 Storage The device must be stored in its original packaging in ...

Страница 9: ...Danger due to electric current Work on electric components may only be carried out by trained electricians or by persons instructed in electricity under the supervision of an electrician in accordance with electrical engineering regulations The 5 electrical safety rules must be observed It is forbidden to carry out work on electrically live parts Cover neighbouring electrical equipment during inst...

Страница 10: ...lectric current Make sure that the supply voltage lies within the allowable tolerance specifications Technical data and the nameplate is fixed to the side of the device Option Power supply for switch cabinet mounting Type STEP PS 1AC 24DC 1 75 Part No 380067 Primary 1 100 240 V 10 50 60 Hz 600 mA Secondary 24 V DC 1 75 A 42 W for top hat rail mounting Operating Instructions NETcon Z G 1NE Electrical...

Страница 11: ...S Interface configured as Master Fail safe resistance combination 499 150 499 Ω 4 DIP switch for parity S2 5 DIP switch for baud rate S1 6 Status LEDs V0 green lit power supply present V1 yellow flashing a data package is received at the MODBUS input and sent to the MODBUS output V2 yellow flashing a data package is received at the MODBUS output and sent to the MODBUS input Operating Instructions NET...

Страница 12: ... The DIP switch S1 left is for the baud rate and the DIP switch S2 right is for the parity Factory setting Dip switches S1 ON 19 200 Dip switches S2 ON 8E1 DIP switch position S1 S2 Coding 1 2 3 Baudrate Parity 0 OFF OFF OFF 4 800 Bit s 8N1 1 ON OFF OFF 9 600 Bit s 8O1 2 OFF ON OFF 19 200 Bit s 8E1 3 ON ON OFF 38 400 Bit s 8N2 4 OFF OFF ON 115 200 Bit s 5 ON OFF ON 6 OFF ON ON 7 ON ON ON No functi...

Страница 13: ...ble devices with which this REPEATER can be combined the limit will not be exceeded 6 3 Delayed data transmission For technical reasons the data is transmitted with a minor time delay Baudrate Bounds Rampdown time Chars 10 bit data ms 11 bit data ms 4 800 3 6 25 6 88 9 600 5 5 21 5 73 19200 5 2 06 2 86 38 400 5 1 30 1 43 115 200 5 0 43 0 48 Operating Instructions NETcon Z G 1NE Communication L BAL...

Страница 14: ...aster Integrated fail safe circuit 499 150 499 Ω Permissible ambient temperature 0 55 C Permissible rel humidity 85 no condensation Electromagnetic compatibility Interference emission EN 61000 6 3 domestic household ap plications Interference immunity EN 61000 6 2 industrial applications Housing protection IP20 Weight 90 g Operating Instructions NETcon Z G 1NE Enclosure L BAL E244 GB 1732 Index 00...

Страница 15: ...ODBUS RS 485 Addressing MODBUS RS 485 Addressing ID B A GND MODBUS RS 485 MODBUS RS 485 Address 1 62 Address 63 126 Without address 2 3 1 ON A D GND MODBUS MASTER B D ID 2 3 1 ON 24 V DC Spannungsversorgung Power supply V in V in 2 GND 2A 2D ID2 2B 2D 1A 1D ID1 1B 1D 1 GND RJ45 Pin 4 B Pin 5 A Pin 8 GND Pin 7 ID 1 8 1 8 Operating Instructions NETcon Z G 1NE Enclosure L BAL E244 GB 1732 Index 003 P...

Страница 16: ...7 3 Dimensions mm Operating Instructions NETcon Z G 1NE Enclosure L BAL E244 GB 1732 Index 003 Part No 16 17 ...

Страница 17: ...tact our technical support for control systems ventilation technology phone 49 0 7940 16 800 Email fan controls service ziehl abegg de Our worldwide contacts are available in our subsidiaries for deliveries outside of Ger many see www ziehl abegg com If you make returns for inspections or repairs we need certain information in order to facilitate focused trouble shooting and fast repair Please use...

Отзывы: