background image

1

General notes

1.1

Meaning

These description is valid only in combination with operating instructions of the used devices. 
The remarks concerning safety, installation and connection described in those operating 
instructions must be followed!
Before installation and start-up, read this documentation carefully to ensure correct use!

2

Safety instructions

Mounting, electrical connection, and start-up operation may only be carried out by an 
electrical specialist in accordance with electrotechnical regulations (e.g. DIN EN 50110 or 
DIN EN 60204)!

It is strictly forbidden for work to be carried out on any components while they are con-
nected to live voltage. The open equipment is protected to IP00. It is possible to come into 
direct contact with dangerous voltages!

3

General description

3.1

Application

This connection box can only be used in conjunction with ZIEHL-ABEGG ECblue fans with motor size 
B (IP20).

3.2

Function

ECblue fans combined with the ECblue (LON) connection box provide the following functions:

The connection box can be used to communicate with the fan controller. 

ECblue fans can be integrated into existing LON

®

 networks.

A LON

®

 network of several ECblue fans can be built up. The communication between the fans 

happens via LONWORKS

®

TP/FT10.

3.3

Transport

The device is packed ex factory to suit the transport method previously agreed.

Always use the original packaging materials when transporting the device.

Avoid shocks and impacts to the device during the transport.

During manual handling the human lifting and carrying restrictions must be observed and adhered 
to.

3.4

Storage

The device must be stored in its original packaging in a dry and weather-proof room.

Avoid exposure to extreme heat and cold.

Avoid over-long storage periods (we recommend a maximum of one year).

3.5

Disposal / recycling

Disposal must be carried out professionally and in an environmentally friendly way in accordance with 
the respective national legal stipulations.

"

Separate the materials by type and in an environmentally friendly way.

"

If necessary, commission a specialist company with the waste disposal.

Operating Instructions 

Connection box ECblue (LON)

General notes

L-BAL-E268-GB 1630 Index 003

Part.-No. 

2/10

Содержание ECblue

Страница 1: ...Connection box ECblue LON Connection control fan MICRO FIT Operating Instructions L BAL E268 GB 1630 Index 003 Part No english ...

Страница 2: ...unctions The connection box can be used to communicate with the fan controller ECblue fans can be integrated into existing LON networks A LON network of several ECblue fans can be built up The communication between the fans happens via LONWORKS TP FT10 3 3 Transport The device is packed ex factory to suit the transport method previously agreed Always use the original packaging materials when trans...

Страница 3: ...n cut out and fastening hole as shown in the drawing Insert the device into the installation cut out from the front and secure with a screw Dimensions mm Operating Instructions Connection box ECblue LON Mounting L BAL E268 GB 1630 Index 003 Part No 3 10 ...

Страница 4: ...n 0 5 1 5 mm 2 flexible with wire end ferrule 3 Line input connection box Wieland plug series GST 18i3 suitable socket part e g GST 18i3 S B1 Z R1 or GST 18i3 1 F B2 Z R1 4 LED green Operation Flashing error code see ECblue assembly instructions chapter Operating state display 5 LED red Fault see ECblue assembly instructions chapter operating state display 6 BUS1 RJ45 7 Service RJ45 8 BUS2 RJ45 9 H...

Страница 5: ...ted to one another PIN 5 on BUS1 BUS2 and Service are only through connected to one another PIN 7 on BUS1 BUS2 and Service are through connected to one another 1 X1 a 2 X1 b 3 X1 c 4 X1 d 5 X1 e 6 X1 f 7 X1 g 8 X1 h 1 X3 a 2 X3 b 3 X3 c 4 X3 d 5 X3 e 6 X3 f 7 X3 g 8 X3 h 1 X2 a 2 X2 b 3 X2 c 4 X2 d 5 X2 e 6 X2 f 7 X2 g 8 X2 h NET_A NET_B n c n c V V NET_A NET_B NET_B NET_A n c n c n c n c V V V V ...

Страница 6: ...ction box is always based on the bus topology With the recommended CAT5 patch cable the maximum cable length is 500 m Wiring and terminator in the LON network 5 4 2 Wiring and terminating resistor in the LON network With bus wiring a terminating resistor of 100 Ω 0 25 W must be fitted to the beinning and end of the line Information The stub lines to the individual devices should be kept as short as...

Страница 7: ...to enable the motor controller function The variables nvoVisual nvoParameter and nviParameter are available for use with ZIEHL ABEGG software and installation devices For dynamic operation i e operation in which the speed changes very often e g control applications a different operating mode has to be selected as the static rotational speed specifications nciSpeedx only allow a limited number of wr...

Страница 8: ...d ST_ON Internal interval timer operational nviTime SNVT_ti me_stamp 84 System time nciNightSrt SNVT_ti me_stamp 84 Night operation start time nciNightEnd SNVT_ti me_stamp 84 Night operation end time nvoContTemp uint 1 Byte 0 255 X Option nvoPowerOut SNVT_switch 95 value 0 200 255 state 0 1 X Power requirement in nvoVisual struct_visual Summary of important nvo for faster queries nvoParaResp SNVT_...

Страница 9: ...uts down Switching back on is only possible by re applying the mains voltage 135 Hall sensor error Starting retried after approx 1 minute 136 Overcurrent fault Motor shuts down Starting retried after approx 1 mi nute 150 external communication error Motor continues running with last set values 158 Supply voltage too high overvolt age Motor shuts down Starting retried if undervoltage no longer exis...

Страница 10: ...our technical support for control systems ventilation technology phone 49 0 7940 16 800 Email fan controls service ziehl abegg de Our worldwide contacts are available in our subsidiaries for deliveries outside of Germany see www ziehl abegg com If you make returns for inspections or repairs we need certain information in order to facilitate focused trouble shooting and fast repair Please use our r...

Отзывы: