WNS Series horizontal Oil-fired (Gas) Boiler

 

 

 

-12- 

can  drain  all  boiler  water,  but  at  this  time  should  open  main  steam  valve  and  make  boiler 
connect with atmosphere. If need shorten cooling time, can add cold water from feeding water 
tube and drain off  hot water through blowing down pipe at the same time, but the water level 
should not lower than the normal water level. 
1.2 Inspection, cleaning and maintenance 
1.2.1 If there are leakages of water level gauge, valves and pipeline flange, do repairing. 
1.2.2 Open burner  installation nozzle, hand-hole cover on the top of boiler, remove all deposit 
ash. 
1.2.3 Remove the ash deposit and residue oil inside furnace. 
1.2.4 Remove the scale and mud, wash it with clean water. 
1.2.5  Check  the  internal  &  external  surface  of  boiler.  For  example,  check  whether  there  are 
corrosion phenomena of the weld of pressure part and steel plate. If find serious default should 
make repairing  in time. If the fault I not so serious, can repair it next time while stop running 
boiler. If find some problems but have no influence to safety, should well make record for later 
reference. 
1.2.6 If necessary, disassemble all outside case and insulation layer to do throughout inspection. 
If  find  some  serious  destroy  part,  first  must  repair  it then  can  use  it. At  the  same  time,  make 
record for the result of checking & repairing. 

  Every year should apply paint to the case of insulation layer and boiler bedplate for at least 

one time. 

If necessary, remove all residual ash inside chimney. 

There are two methods of wet & dry maintenance for long-term protection of boiler. If stop 

running boiler  for over one month should use dry maintenance,  if less than one month should 
use wet maintenance. 
4.1 Dry maintenance 
      Stop  running  boiler,  drain  off  all  boiler  water,  remove  all  dirt  inside  boiler  and  clean  it, 
bake it by faint fire, close all hand-holes and valves of pipeline. 
4.2 Wet maintenance 
      Stop running boiler then drain off all boiler water, remove all dirt inside boiler and clean it 
thoroughly,  re-add  the  treated  water  to  full  of  water,  then  heat  it  to  100

,  let  the  gas  inside 

eater  out  of  furnace,  close  all  valves.  The  wet  maintenance  is  not  permitted  to  use  for  cold 
weather or place for avoid destroy the boiler because of freezing. 

 

Ⅷ、

Inspection & hydraulic testing for pressure parts 

Do  periodical  inspection  to  internal  space  &  external  surface  of  boiler  according  to  the 

stipulation of 

Safety  & Technical Supervision Regulation for Steam Boiler

. In generally, do 

internal inspection every two years, do hydraulic testing to boiler for one time every six years. 

Except for above item 1 mentioned periodical inspection, if happen to one of following case, 

must do internal & external inspection and hydraulic testing: 
2.1 New installing, re-installing and move installing boiler. 
2.2 Stop running boiler for over one year, before re-start running boiler. 
2.3 After repair or change some pressure parts greatly and re-running boiler for one year. 
2.4 According to the boiler running status, has doubt to the equipments status. 

  Before inspection, should remove all the internal scale and external smoke dirt thoroughly, 

if  necessary,  should  disassemble  the  external  cover  and  insulation  layer.  The  inspection  focal 
point is as following: 
3.1 Check the boiler drum, furnace weld and tube-hole to see whether they are in normal status, 
whether exist leakage. 
3.2 Whether the boiler steel plates have corrosion, bulb or deformation. 
3.3 Whether there is scale or water slag beside pressure parts. 

Содержание WNS Series

Страница 1: ...l Gas fired Oil Boiler ZhangjiagangWilfordThermalTechnology Co Ltd Please read this manual carefully before using this machin Only qualified workers can operate this machine If the operation method is...

Страница 2: ...ler structure 5 Boiler work principle 7 Operation Manual of Gas Fired Boiler 7 Operation requirements 7 Maintenance of boiler 11 Inspection hydraulic testing for pressure parts 12 Attention for users...

Страница 3: ...appendix list product quality certificate one copy Installation description Preparation work before installation Check the completeness of the boiler accessories according to the packing list and the...

Страница 4: ...drawings Water pump is connected with water tank if user has additional requirements can provide spare water pump 4 2 Safety valve must be assembled after hydraulic testing and connected to the tube f...

Страница 5: ...r boiler water level indication and for the supervision by boiler operator The water level controller is used for transmitting the value of boiler water level The control system will control the runni...

Страница 6: ...ecause of some reasons the photo resistance has no sense of light stop burning and send out acoustical light alarm continue post purging for gas fired boiler then stop running boiler Check and find ou...

Страница 7: ...ill feed water into the boiler so as to keep it in the normal water level The above mentioned process continues steam will continuously produced by heating the water by absorbing the afterheat of firi...

Страница 8: ...iler again according to above mentioned way Running boiler 3 1 Start and running boiler normally 3 1 1 Open the air vent valve on the top of boiler or lift the valve core of safety valve 3 1 2 Start b...

Страница 9: ...warming tube should be according to the length diameter of pipeline steam temperature and so on In generally it should not less than ten minutes After the tube is heated open the main steam valve slow...

Страница 10: ...it quality 6 9 The photoresistance should be removed for examination testing every three month measure the values of resistance of bright dark Photoresistance type MG41 100A Rated power capacity 100M...

Страница 11: ...etter W means week Letter M means month Letter S means season Letter Y means year Blow down of boiler In generally the feeding water contains mineral matter when the water enters into boiler and after...

Страница 12: ...nance if less than one month should use wet maintenance 4 1 Dry maintenance Stop running boiler drain off all boiler water remove all dirt inside boiler and clean it bake it by faint fire close all ha...

Страница 13: ...ter dropping to working pressure During inspection the pressure should kept no change If find any leakage should well make record for later repairing when the pressure drop to atmosphere After hydraul...

Отзывы: