STANDARD OPERATING PROCEDURE 
String Inverter Installation – Zeverlution Series 

 

Version 1.2 Effective date 02/08/2017

 

 

Page 7 of 15 

 

 

 

Any DC cabling must be adequately mechanically protected and must be run in HD Solar conduit. 
Where it is exposed to direct sunlight, HD conduit, marked with the letter T, is to be used. For any 
internal cable runs (e.g. within wall cavities, under floors and within roof spaces), rigid HD solar 
conduit shall be used. The conduit must be labelled with PV or SOLAR at intervals not exceeding 
2 meters. Refer to section 4.3 of AS/NZS 4777.1:2016. Use stainless steel saddles for all external 
conduit runs. 

 

Wiring between the inverter and the DC isolator may be without conduit where the length of DC 
cable does not exceed 300mm.  
The minimum cross section of any DC wiring is 4mm². All  DC  cables shall be multi-stranded, 
insulated  and sheathed  and PV1-F rated as  per AS5033.  The table below shows the maximum 
cable length (one way) between array and inverter with JA 290W panels, allowing for a 2% voltage 
drop. 
 

 

Panels per string 

10 

Max. cable length 

25 

25 

25 

30 

35 

40 

45 

50 

 
Genuine MC4 connectors must be used to connect the DC cables to the array output cable. A 
MC4 crimping tool is required to attach the stranded wire to the metal pin. 
 

DC isolators 

DC isolators must be installed adjacent to the inverter. The clearances for the inverter provided in 
section 5.2.4 do not apply for any disconnection equipment. This means isolators can be installed 
directly underneath or next to the inverter. 
Solarcity supplies a Kraus & Naimer DC isolator - KFD25 T204/NZ-P002 KL11V. It is important that 
the screw terminals of the DC isolator are not over tightened. A torque screwdriver shall be used 
to tighten the terminal screws with a torque of 1.25Nm. 
Remove the isolator from the enclosure prior to fixing the enclosure to the wall. Dust from drilling 
can damage the switch.  

 

Please see the 

isolator datasheet

 for further details. 

 

 

 

 

 

Содержание Zeverlution Series

Страница 1: ...2 BEHAVIOURAL 2 SAFETY 2 INSTALLATION PROCEDURE 3 String Design Guidelines 3 5 1 1 String Layout Without Optimisers 3 5 1 2 String Layout with Optimisers 3 5 1 3 Shading 3 5 1 4 Maximum String Voltage...

Страница 2: ...d electrical part of the inverter installation instruction The focus of this SOP lies on the physical installation of Zeverlution 2000s and Zeverlution 4000 inverters and any associated switch gear DC...

Страница 3: ...4000 inverters and for arrays with or without optimisers the minimum and maximum strings lengths are as follows minimum number of modules per string is 3 maximum number of modules per string is 10 5 1...

Страница 4: ...systems with a peak output between 1 5kWp and 3kWp 6 to 10 modules where the peak performance rating per panel at STC does not exceed 295Wp For further details please refer to the Zeverlution 2000s da...

Страница 5: ...et which is used to fix the units to a suitable wall Please refer to the solarcity wall cladding guide for suitable wall claddings to mount the inverter on 1 Use the wall bracket as a drilling templat...

Страница 6: ...ble The inverter must not be installed in a location where it is exposed to direct sunlight Wiring 5 3 1 DC Wiring All wiring must be installed and sized in accordance with the relevant requirements o...

Страница 7: ...ted as per AS5033 The table below shows the maximum cable length one way between array and inverter with JA 290W panels allowing for a 2 voltage drop Panels per string 3 4 5 6 7 8 9 10 Max cable lengt...

Страница 8: ...to maintain the correct polarity the connectors are also marked with and symbols The steps below explain how to assemble SUNCLIX connectors Ensure that the array cable is de energized before installin...

Страница 9: ...lled on an appropriate roof penetration kit must be used Roof penetrations must always be located under the solar panels where an attic space is accessible for the cable run Where cable s pass through...

Страница 10: ...mm which is usually too short for leapfrog wiring Please use standard daisy chain wiring for all optimised array sections 5 3 3 AC Wiring The inverter is connected to the switchboard using double insu...

Страница 11: ...S 5033 2014 and follow the instructions outlined in the standard Attached to this document you ll find a commissioning sheet which you may use to record the test results A completed and signed copy of...

Страница 12: ...To confirm wait for approximately 10 seconds until the inverter automatically returns to the initial display showing the error code Connecting the inverter to the Internet The inverter needs to be co...

Страница 13: ...before setting up the WIFI connection 2 With the inverter powered up use a smartphone or laptop to search for the inverter s wireless access point This will display as ZEVERSOLAR XXXX Connect to this...

Страница 14: ...omer s wireless network 6 After approximately one minute the inverter should connect to the customers wifi network and the status indicator on the wireless page will show a green tick 7 Take a photo o...

Страница 15: ...rnet cable through the comms gland on the bottom of the inverter ensuring that the cable entry is sealed from dust and moisture 3 The inverter automatically obtains an IP address from the router via D...

Страница 16: ...rod MEN link removed Earth continuity 2 Main earth conductor to array frame Polarity check and PV open circuit voltage Polarity Voltage V String 1 String 2 if applicable PV array at switch disconnect...

Отзывы: