14
battery manufacture’s user manual.
Suggestion: The battery should be installed with the correct distance between
each battery unit, for details please refer to the battery manufacture’s user
manual.
The number of battery cells used will be determined by the customer
depending on the required capacity, however the choice will be limited to a
total series voltage array of 48 V.
Please follow the steps below to implement battery connection:
1.
Check the nominal voltage of batteries. The nominal input voltage
should meet Zeus Appollo product specification.
2.
Disconnect the DC breaker between the inverter and the battery.
3.
Disconnect the screw cap from the insulator.
4.
Disconnect the waterproof ring from the insulator.
5.
Feed the cable through the components in this order: screw cap,
waterproof ring, insulator, battery cover and battery terminal.
Refer to Figure 4.3-2.
6.
Compress the terminal head using an appropriate tool and screw
down the screw cap slightly. Refer to Figure 4.3-3, Figure 4.3-4.
7.
Insert the battery terminals into the corresponding apertures and
fasten them with a screwdriver and a spanner, then fasten the
battery cover with the pan head screws provided in the accessory
bag. Refer to Figure 4.3-5, Figure 4.3-6, Figure 4.3-7.
8.
Screw down screw cap again.
cable
Figure 4.3-2
Figure 4.3-3
waterproof ring
battery cover
battery terminal
screw cap
insulator
crimp