![Zetec TOPAZ Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/zetec/topaz/topaz_technical-manuallines_3525398019.webp)
TOPAZ
– Technical Guidelines
19
Figure 8-1 C-Scan Stitching Window
6.
On the right side of the window, the
C-Scan data
shows the available c-scan data channels
available in the merged file. Select a c-scan data channel to include in the stitching.
7.
For the selected data, define the
Data type
(
Amplitude
or
Position
).
8.
In
Gates
, select the detection gate of the C-scan data you wish to stitch.
9.
In
Method
, define if you want to
Keep minimum
or
Keep maximum
values of the c-scan data in
the case of data overlap.
10.
Click
Add
.
The C-scan data is now added to the c-scan display on the left.
Figure 8-2 C-Scan Stitching Window with C-Scan Data Added