Please take a few moments to check all pack contents listed.
Requires 2 person assembly.
Tools required: Corded / Cordless Drill, Pozi-drive Bit / Screwdriver, Tape Measure
3mm Drill Bit required to drill screw holes during construction.
Starlight Arch is now complete.
1.
Position 2no. Rafters (B) 100mm in from either end of 2no. Curved Bearers (A)
and fix using 4no. 60mm screws – 2 no. screws per Rafter (B) (see Fig 1a).
Space out remaining Rafters (B) equally (Fig 1b) and attach using 6no. 60mm
screws (2no. screws per rafter).
2.
Place 1no. Trellis Panel (D) 400mm from base of 1no. Post (C) and fix using 2no.
40mm screws. Place trellis/post assembly onto second Post (C) with Trellis Panel
(D) 400mm from bottom of second Post (C) and fix using 2no. 40mm screws (see
Figs 2a & 2b).
Repeat process for remaining Trellis Panel (D) and Posts (C).
3.
Position and fix 1no. post/trellis assembly onto rafter assembly (see Fig 3) and fix
using 4no. 60mm Screws (2no. screws per post).
Repeat process for remaining post/trellis assembly on opposite side of Arch.