background image

Rabbit Hutch 1.2m is now complete.

1.

Fix Back Panel A to Side Panels B using 6no 50mm Screws, 3no per side (Figs.1a & 1b)

2.

Fix Front Panel C to Side Panels B using 6no 50mm Screws, 3no per side (Figs.2a & 
2b)

3.

Attach Floor Panel D to Back Panel A and Front Panel C using 6no 30mm Screws 

– 2no 

into Back Panel A and 4no into Front Panel C (Figs.3a & 3b). 

With the assembly laid on its back and the entry ramp fully opened, further attach Floor 
Panel D to Side Panel B using 3no 50mm Screws as shown in Fig.3c.

4.

Fix 8no Braces E as shown in Fig.4 using 16no 50mm Screws 

– 2no per Brace E.

5.

Attach Internal Panel F to battens of Back Panel A and Front Panel C as shown in 
Fig.5a using 6no 50mm Screws 

– 3no into each panel.

Further attach Internal Panel F to Floor Panel D using 2no 40mm Screws (Fig.5b).

6.

Position Roof Panel G centrally over assembly and attach using 12no 40mm Screws 

4no into each of the Back and Front Panel A and C and 2no into each Side Panel B 
(Fig.6).

7.

Fix Felt H to the Roof Panel G using 28no equally spaced Felt Nails around the sides as 
shown in Fig.7.

8.

Attach Front and Back Fascias J to Roof Panel G using 10no 40mm Screws 

– 5no per 

Fascia J (Fig.8a)
Attach Side Fascias K to Roof Panel G using 6no 40mm Screws 

– 3no per Fascia K 

(Fig.8b)   

Rabbit Run 

– Optional Extra

9.

With the assembly up side down Place Rabbit Run Back Panel L between legs of Side 
Panels B and fix in position using 7no 50mm Screws 

– 2no into each leg and 3no into 

Back Panel A (Figs.9a & 9b).

10. Place Rabbit Run Side Panels M between legs of Side Panels B and fix in position using 

12no 50mm Screws 

– 2no per Side Panel B (Fig.10a) and 2no per leg of Side Panel B 

(Fig.10b).

11. Place Rabbit Run Front Panel N between legs of Side Panels B and fix in position using 

7no 50mm Screws 

– 2no into each leg and 3no into Front Panel C (Figs.11a & 11b).

Содержание Rabbit Hutch 1.2m

Страница 1: ...0 635m x 1 065 0 975m Product Name Rabbit Hutch 1 2m Pressure Treated products should not be treated with any other products for the first month PLEASE KEEP THIS INSTRUCTION Zest4Leisure 01352 752555 option 1 sales zest4leisure co uk V1 03 16 ...

Страница 2: ... from www zest4leisure co uk downloads category C1 Rabbit Hutch 1 2m Pack List Item Description Quantity A Back Panel 1 B Side panel Handed 2 C Front panel 1 D Floor Panel 1 E Brace 8 F Internal Panel 1 G Roof Panel 1 H Felt 1 J Back Front Fascia 2 K Side Fascia 2 Rabbit Run Optional Extra L Rabbit Run Back Panel 1 M Rabbit Run Side Panel 2 N Rabbit Run Front Panel 1 www zest4leisure co uk Fixings...

Страница 3: ...Rabit Hutch 1 2m Assembly Instructions Requires 2 person assembly The colour version of this document can be downloaded from www zest4leisure co uk downloads category C1 www zest4leisure co uk ...

Страница 4: ...Panel G centrally over assembly and attach using 12no 40mm Screws 4no into each of the Back and Front Panel A and C and 2no into each Side Panel B Fig 6 7 Fix Felt H to the Roof Panel G using 28no equally spaced Felt Nails around the sides as shown in Fig 7 8 Attach Front and Back Fascias J to Roof Panel G using 10no 40mm Screws 5no per Fascia J Fig 8a Attach Side Fascias K to Roof Panel G using 6...

Страница 5: ...www zest4leisure co uk 1b 1a 2a 2b 3a 3b 3c 4 ...

Страница 6: ...www zest4leisure co uk 5b 5a 6 7 8a 8b ...

Страница 7: ...www zest4leisure co uk 9b 9a 10a 10b 11a 11b Rabbit Run Optional Extra ...

Отзывы: