background image

 

11

-27-20

1

9

Homewerks Worldwide, LLC • Lake Bluff, IL 60044 • HomewerksWW.com

TUB AND SHOWER FAUCET 

1

0SHO

1

H-CH-AV – Polished chrome finish

PACKAGE AND HARDWARE CONTENTS

PART

DESCRIPTION

QUANTITY

A

B

C

D

E

G

F

H

A

Shower head

1

B

Shower arm

1

C

Shower arm flange

1

D

Hot handle assembly

1

E

Cold handle assembly

1

F

Tub spout with diverter

1

G

Handle flanges

2

H

Valve body

1

SAFETY INFORMATION

Please read and understand this entire manual before attempting to assemble, 

operate or install the product. 
WARNING
  •   Protect your eyes with safety glasses when cutting or soldering water  

supply lines. 

CAUTION
  •   If you solder the joints during installation, the seats, cartridges, and washers 

must be removed before using a flame or the warranty will be voided on 

these parts.

  •  Cover the drain to avoid losing parts.

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare 

parts with package and hardware contents list. If any part is missing or damaged,  

do not attempt to assemble the product. Contact customer service for 

replacement parts. 
Estimated Assembly Time: 30 minutes
Tools required for assembly (not included): adjustable wrench, thread sealant 

tape, strap wrench, Phillips head screwdriver, silicone

Installation may vary depending on how the previous tub and/or shower faucets 

were installed. Supplies necessary for the installation of the product are not all 

included; however, they are available wherever plumbing supplies are sold.
Prior to beginning installation, turn off the hot and cold water lines, then turn on 

the old faucet to release built-up pressure. When installing the new tub and/or 

shower faucets, hand tighten the connector nuts. 

DO NOT OVERTIGHTEN. 

Connections that are too tight will reduce the integrity of the system.

Need Help? Please call our toll-free line at (877) 3

1

9-3757 (7:30 am to 4:30 pm CST) for additional assistance or service.

Содержание AQUA VISTA 10SHO1H-CH-AV

Страница 1: ...y of product make sure all parts are present Compare parts with package and hardware contents list If any part is missing or damaged do not attempt to assemble the product Contact customer service for replacement parts Estimated Assembly Time 30 minutes Tools required for assembly not included adjustable wrench thread sealant tape strap wrench Phillips head screwdriver silicone Installation may va...

Страница 2: ... The shower outlet hose should be 1 1 4 in in diameter For the cold water inlet the right side and the hot water inlet the left side cut or leave a 1 3 8 in to 2 in diameter hole recomended size is 1 3 4 in The center to center distance between the cold and hot water inlets should be 8 in 1 3 8 in 2 in 1 3 8 in 2 in 8 in Min 48 in Tub Shower 30 in Tub Shower 8 in 2 5 Installingthetubandshower outl...

Страница 3: ...5 16 in to 4 3 32 in from the finished wall to the lower pipe elbow 8 1 not included Tighten the elbows 8 1 and tub spout outlet pipe connec tions 8 2 with a strap wrench not included Thread the spout F onto the tub spout outlet pipe connec tion 8 2 in a clockwise direction until the tub spout F becomes flush with the finished wall Use a strap wrench to tighten the tub spout F F 8 1 8 2 Wall 3 15 ...

Страница 4: ...lting from the use of abrasive or chemical cleaners SHALLVOID THIS WARRANTY This warranty is not applicable to any products or parts of products where damage is caused by use of non genuine parts is due to installation error product misuse negligence or faulty maintenance or where the product is not installed according to local building codes This warranty excludes labor charges or damage incurred...

Отзывы: