background image

Please take a few moments to check all pack contents listed. 

Assembly requires 2 persons.  

Tools required: Corded/Cordless Drill, Pozidrive Bit/Screwdriver, 3mm Drill Bit 
required in order for you to drill all screw holes before construction.   

1.

Align two Side Panels (A) together and pre-drill as shown by arrows in Fig 1a. Fix 
together using 4no 40mm screws. Repeat to attach subsequent panels to form a  
square (tapered) obelisk.  

2.

   Locate Cap (B) into top of obelisk and fix in position using 4no 40mm screws 

(See Figs 2a & 2b). 

Ben Nevis Obelisk is now complete. 

1a 

1c 

1b 

2a 

2b 

www.zest4leisure.co.uk 

Отзывы: